Australia: LNG infrastructure
Australia has 29 LNG terminals and 149 tracked gas pipelines in the Global Energy Monitor tracker. It is a net exporter, with 81.8 Mtpa of operating liquefaction capacity and no operating import capacity.
Export capacity
81.8 Mtpa
5 Mtpa under construction
Import capacity
—
2.33 Mtpa under construction
Pipelines
149
50,192 km tracked
Fleet
0
0 owned from here (flag not reported this release)
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 22 | 81.8 | 5 |
| Import (regasification) | 7 | — | 2.33 |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Australia
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Abbot Point LNG TerminalQueensland | Export | Floating | Cancelled | Not reported | 1 | — |
| Arrow Energy LNG TerminalQueensland | Export | Not reported | Cancelled | Not reported | 1 | — |
| Australia Pacific LNG TerminalQueensland | Export | Not reported | Operating | 9 Mtpa | 2 | 2016 |
| Bonaparte FLNG TerminalWestern Australia | Export | FLNG | Cancelled | Not reported | 1 | — |
| Browse FLNG TerminalWestern Australia | Export | FLNG | Proposed | 11.4 Mtpaproposed | 2 | — |
| Buru FLNG TerminalKimberly | Export | FLNG | Proposed | Not reported | 1 | — |
| Cash Maple FLNG TerminalWestern Australia | Export | FLNG | Cancelled | Not reported | 1 | — |
| Crib Point FSRU TerminalVictoria | Import | FSRU | Cancelled | Not reported | 1 | — |
| Darwin LNG TerminalNorthern Territory | Export | Not reported | Proposed | 6 Mtpaproposed | 2 | 2006 |
| Equus FLNG TerminalWestern Australia | Export | FLNG | Cancelled | Not reported | 1 | — |
| Fishermans Landing LNG TerminalQueensland | Export | Not reported | Cancelled | Not reported | 1 | — |
| Geelong FSRUVictoria | Import | FSRU | Proposed | 3 Mtpaproposed | 1 | — |
| Gladstone LNG TerminalQueensland | Export | Not reported | Operating | 7.8 Mtpa | 2 | 2015 |
| Gorgon LNG TerminalWestern Australia | Export | Not reported | Operating | 15.6 Mtpa | 4 | 2016 |
| Ichthys FLNG TerminalWestern Australia | Export | FLNG | Operating | 9.3 Mtpa | 3 | 2018 |
| Longford LNG TerminalVictoria | Import | Not reported | Cancelled | Not reported | 1 | — |
| Newcastle FSRUNew South Wales | Import | FSRU | Shelved | Not reported | 1 | — |
| North West Shelf LNG TerminalWestern Australia | Export | Not reported | Operating | 14.2 Mtpa | 5 | 1989 |
| Northern Territory LNG TerminalNorthern Territory | Export | Not reported | Proposed | 6.6 Mtpaproposed | 1 | — |
| Outer Harbor FSRUSouth Australia | Import | FSRU | Proposed | 2 Mtpaproposed | 1 | — |
| Pluto LNG TerminalWestern Australia | Export | Not reported | Operating | 4.9 Mtpa | 3 | 2012 |
| Port Kembla FSRUNew South Wales | Import | FSRU | Under construction | 2.33 Mtpaunder construction | 1 | — |
| Port Phillip Bay FSRUVictoria | Import | FSRU | Proposed | 4.7 Mtpaproposed | 1 | — |
| Poseidon FLNG Terminal | Export | FLNG | Cancelled | Not reported | 1 | — |
| Prelude FLNG TerminalWestern Australia | Export | FLNG | Operating | 3.6 Mtpa | 1 | 2019 |
| Queensland Curtis LNG TerminalQueensland | Export | Not reported | Operating | 8.5 Mtpa | 2 | 2014 |
| Scarborough FLNG TerminalWestern Australia | Export | FLNG | Cancelled | Not reported | 1 | — |
| Tassie Shoal LNG TerminalNorthern Territory | Export | Not reported | Cancelled | Not reported | 1 | — |
| Wheatstone LNG TerminalWestern Australia | Export | Not reported | Operating | 8.9 Mtpa | 2 | 2017 |
Gas pipelines crossing Australia
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| APLNG PipelineQueensland → Queensland | Australia | Operating | 530 km | 15.1 bcm/y | 1 | 2015 |
| Amadeus Gas PipelineNorthern Territory → Northern Territory | Australia | Operating | 1,658 km | 1.66 bcm/y | 1 | 1986 |
| Amadeus Gas Pipeline | Australia | Cancelled | 0 km | 3.51 bcm/y | 1 | 2025 |
| Amadeus to Moomba Gas PipelineNorthern Territory → South Australia | Australia | Cancelled | 950 km | 1.24 bcm/y | 1 | 2024 |
| Anglo-Mitsui Gas PipelineQueensland → Queensland | Australia | Operating | 23 km | 0.5 bcm/y | 1 | 1996 |
| Arrow Bowen PipelineQueensland → Queensland | Australia | Cancelled | 580 km | 15.1 bcm/y | 1 | 2028 |
| Ashburton Onslow Gas PipelineWestern Australia → Western Australia | Australia | Operating | 110 km | 0.1 bcm/y | 1 | 2016 |
| Atlas Gas PipelineQueensland → Queensland | Australia | Operating | 60 km | 0.38 bcm/y | 1 | 2019 |
| BSOPP Gas PipelineWestern Australia → Western Australia | Australia | Operating | 79 km | Not reported | 1 | 2021 |
| Barossa Export Pipeline | Australia | Operating | 262 km | 8.69 bcm/y | 1 | 2025 |
| Barossa Export Pipeline | Australia | Operating | 122 km | 8.69 bcm/y | 1 | 2025 |
| BassGas PipelineVictoria → Victoria | Australia | Operating | 35 km | Not reported | 1 | 2017 |
| Bayu-Undan to Darwin PipelineJDPA → Northern Territory | Australia | Idle | 502 km | 4.75 bcm/y | 1 | 2005 |
| Beetaloo Lateral PipelineNorthern Territory → Northern Territory | Australia | Cancelled | 87 km | 3.51 bcm/y | 1 | 2025 |
| Beetaloo Lateral PipelineNorthern Territory → Northern Territory | Australia | Cancelled | 361 km | 3.51 bcm/y | 1 | 2025 |
| Beetaloo Lateral PipelineNorthern Territory → Queensland | Australia | Cancelled | 749 km | 3.51 bcm/y | 1 | 2025 |
| Beetaloo Lateral Pipeline | Australia | Cancelled | 0 km | 13.6 bcm/y | 1 | 2028 |
| Beetaloo–McArthur River Connecting PipelineNorthern Territory → Northern Territory | Australia | Shelved | 39 km | Not reported | 1 | — |
| Beharra Springs PipelineWestern Australia → Western Australia | Australia | Operating | 1.6 km | 0.39 bcm/y | 1 | 1992 |
| Berri to Mildura PipelineSouth Australia → New South Wales | Australia | Operating | 148 km | 0.02 bcm/y | 1 | 1999 |
| Berwyndale to Wallumbilla PipelineQueensland → Queensland | Australia | Operating | 112 km | 4.26 bcm/y | 1 | 2009 |
| Blue Energy Bowen Gas PipelineQueensland → Queensland | Australia | Proposed | 500 km | 3.01 bcm/y | 1 | 2023 |
| Bonaparte Gas PipelineNorthern Territory → Northern Territory | Australia | Operating | 287 km | 0.77 bcm/y | 1 | 2008 |
| Braemar 2 PipelineQueensland → Queensland | Australia | Operating | 110 km | Not reported | 1 | 2009 |
| Brigalow Pipeline ProjectQueensland → Queensland | Australia | Proposed | 23 km | Not reported | 1 | 2028 |
| Browse to NWS Gas PipelineWestern Australia → Western Australia | Australia | Proposed | 900 km | 22 bcm/y | 1 | 2028 |
| Browse to NWS Gas PipelineWestern Australia → Western Australia | Australia | Proposed | 85 km | 11.2 bcm/y | 1 | 2028 |
| Bulloo Interlink PipelineQueensland → New South Wales | Australia | Proposed | 340 km | 8.03 bcm/y | 1 | 2028 |
| Carisbrook to Horsham PipelineVictoria → Victoria | Australia | Operating | 183 km | 0.1 bcm/y | 1 | 1998 |
| Carpentaria Gas PipelineQueensland → Queensland | Australia | Operating | 840 km | 1.19 bcm/y | 1 | 1998 |
| Carpentaria Gas PipelineQueensland → Queensland | Australia | Cancelled | 840 km | 10.8 bcm/y | 1 | 2028 |
| Carpentaria Gas PipelineQueensland → Queensland | Australia | Operating | 96 km | 0.18 bcm/y | 1 | 1998 |
| Carpentaria Gas PipelineQueensland → Queensland | Australia | Cancelled | 0 km | 3.51 bcm/y | 1 | 2025 |
| Casino to Iona PipelineVictoria → Victoria | Australia | Operating | 46 km | 1.06 bcm/y | 1 | 2006 |
| Central Ranges Pipeline | Australia | Operating | 295 km | 0.13 bcm/y | 1 | 2006 |
| Central West PipelineNew South Wales → New South Wales | Australia | Operating | 255 km | 0.13 bcm/y | 1 | — |
| Cheepie to Barcaldine Gas PipelineQueensland → Queensland | Australia | Operating | 420 km | 0.11 bcm/y | 1 | 1995 |
| Colongra Gas Transmission and Storage PipelineNew South Wales → New South Wales | Australia | Operating | 9 km | 0.4 bcm/y | 1 | 2009 |
| Comet Ridge to Wallumbilla PipelineQueensland → Queensland | Australia | Operating | 127 km | 10.9 bcm/y | 1 | 2007 |
| Condamine to Braemar PipelineQueensland → Queensland | Australia | Operating | 150 km | 0 bcm/y | 1 | 2005 |
| Coolah to Newcastle PipelineNew South Wales → New South Wales | Australia | Cancelled | 280 km | Not reported | 1 | — |
| Crib Point Pakenham PipelineVictoria → Victoria | Australia | Cancelled | 60 km | 98.2 bcm/y | 1 | 2023 |
| Crux Gas Pipeline | Australia | Proposed | 160 km | 5.62 bcm/y | 1 | 2027 |
| Daly Waters to McArthur River Gas Pipeline | Australia | Operating | 332 km | 0.16 bcm/y | 1 | 1995 |
| Dampier to Bunbury Natural Gas PipelineWestern Australia → Western Australia | Australia | Operating | 1,597 km | 8.67 bcm/y | 1 | 1984 |
| Darling Downs PipelineQueensland → Queensland | Australia | Operating | 292 km | 5.13 bcm/y | 1 | 2009 |
| Dawson Valley PipelineQueensland → Queensland | Australia | Operating | 47 km | 0.29 bcm/y | 1 | 1996 |
| Denison Gas PipelineQueensland → Queensland | Australia | Operating | 127 km | Not reported | 1 | — |
| Dingo Gas Field PipelineNorthern Territory → Northern Territory | Australia | Operating | 50 km | 0.07 bcm/y | 1 | 2015 |
| ERM Wellington PipelineNew South Wales → New South Wales | Australia | Cancelled | 219 km | Not reported | 1 | — |
| East Spar PipelineOffshore Australia → Western Australia | Australia | Operating | 63 km | 1.02 bcm/y | 1 | 1996 |
| Eastern Gas PipelineVictoria → New South Wales | Australia | Operating | 797 km | 3.44 bcm/y | 1 | 2000 |
| Eastern Gas PipelineNew South Wales → New South Wales | Australia | Cancelled | 185 km | 3.01 bcm/y | 1 | 2023 |
| Eastern Goldfields Pipeline SystemWestern Australia → Western Australia | Australia | Operating | 198 km | 0.08 bcm/y | 1 | 2018 |
| Eastern Goldfields Pipeline SystemWestern Australia → Western Australia | Australia | Operating | 293 km | 0.21 bcm/y | 1 | 2016 |
| Eastern Goldfields Pipeline SystemWestern Australia → Western Australia | Australia | Operating | 85 km | 0.46 bcm/y | 1 | — |
| Eastern Goldfields Pipeline SystemWestern Australia → Western Australia | Australia | Operating | 5.7 km | 0.08 bcm/y | 1 | — |
| Eastern Goldfields Pipeline SystemWestern Australia → Western Australia | Australia | Operating | 5 km | 0.08 bcm/y | 1 | — |
| Eastern Goldfields Pipeline SystemWestern Australia → Western Australia | Australia | Operating | 14 km | Not reported | 1 | 2020 |
| Equus Gas Pipeline | Australia | Cancelled | 210 km | 3.51 bcm/y | 1 | 2024 |
| Equus Gas Pipeline | Australia | Proposed | 200 km | 4.08 bcm/y | 1 | 2027 |
| Fortescue River Gas PipelineWestern Australia → Western Australia | Australia | Operating | 270 km | 0.64 bcm/y | 1 | 2015 |
| GLNG PipelineQueensland → Queensland | Australia | Operating | 435 km | 13.8 bcm/y | 1 | 2014 |
| Galilee Gas PipelineQueensland → Queensland | Australia | Cancelled | 585 km | 2.01 bcm/y | 1 | 2028 |
| Galilee Gas Pipeline | Australia | Cancelled | 0 km | 5.02 bcm/y | 1 | 2028 |
| Galilee Gas PipelineQueensland → Queensland | Australia | Shelved | 420 km | Not reported | 1 | — |
| Galilee to Moranbah PipelineQueensland → Queensland | Australia | Cancelled | 240 km | 2.01 bcm/y | 1 | — |
| Gatton to Gympie PipelineQueensland → Queensland | Australia | Cancelled | 200 km | Not reported | 1 | — |
| Gloucester PipelineNew South Wales → New South Wales | Australia | Cancelled | 100 km | Not reported | 1 | — |
| Goldfields Gas PipelineWestern Australia → Western Australia | Australia | Operating | 1,380 km | 2.03 bcm/y | 1 | 1996 |
| Gorgon and Jansz Feed Gas PipelineWestern Australia → Western Australia | Australia | Operating | 227 km | 2.91 bcm/y | 1 | 2017 |
| Ichthys Gas PipelineOffshore Australia → Western Australia | Australia | Operating | 889 km | 16.4 bcm/y | 1 | 2018 |
| Ironbark Project PipelineQueensland → Queensland | Australia | Cancelled | 34 km | 1.2 bcm/y | 1 | 2021 |
| Judith Gas PipelineVictoria → Victoria | Australia | Proposed | 40 km | 0.82 bcm/y | 1 | — |
| Judith Gas PipelineVictoria → Victoria | Australia | Proposed | 11 km | 0.82 bcm/y | 1 | — |
| Kalgoorlie to Kambalda PipelineWestern Australia → Western Australia | Australia | Operating | 44 km | 0.26 bcm/y | 1 | 1996 |
| Kalgoorlie to Kambalda PipelineWestern Australia → Western Australia | Australia | Operating | 44 km | 0.26 bcm/y | 1 | 1996 |
| Kambalda to Esperance Pipeline | Australia | Operating | 342 km | 0.06 bcm/y | 1 | 1996 |
| Karratha to Cape Lambert PipelineWestern Australia → Western Australia | Australia | Operating | 57 km | 0.95 bcm/y | 1 | 1984 |
| Katherine to Gove Gas PipelineNorthern Territory → Northern Territory | Australia | Cancelled | 603 km | 0.9 bcm/y | 1 | — |
| Kincora to Wallumbilla PipelineQueensland → Queensland | Australia | Operating | 53 km | 0.3 bcm/y | 1 | 1977 |
| Mahalo Gas Hub PipelineQueensland → Queensland | Australia | Proposed | 73 km | 0.25 bcm/y | 1 | — |
| Mid West PipelineWestern Australia → Western Australia | Australia | Operating | 353 km | 0.19 bcm/y | 1 | 1999 |
| Moomba Adelaide Pipeline SystemSouth Australia → South Australia | Australia | Operating | 1,184 km | 2.42 bcm/y | 1 | 1969 |
| Moomba Sydney Pipeline SystemSouth Australia → South Australia, New South Wales | Australia | Operating | 1,300 km | 4.48 bcm/y | 1 | 1976 |
| Moomba Sydney Pipeline System | Australia | Operating | 58 km | 4.48 bcm/y | 1 | — |
| Moomba Sydney Pipeline System | Australia | Operating | 245 km | 0.25 bcm/y | 1 | — |
| Moomba Sydney Pipeline System | Australia | Operating | 131 km | 2.24 bcm/y | 1 | — |
| Moomba Sydney Pipeline System | Australia | Operating | 179 km | 0.13 bcm/y | 1 | — |
| Moomba Sydney Pipeline System | Australia | Operating | 88 km | 2.24 bcm/y | 1 | — |
| Moranbah to Denison Trough North Gas PipelineQueensland → Queensland | Australia | Cancelled | 200 km | Not reported | 1 | — |
| Mortlake Gas PipelineVictoria → Victoria | Australia | Operating | 83 km | 4.01 bcm/y | 1 | 2011 |
| NSW Gas NetworkNew South Wales → New South Wales | Australia | Operating | 239 km | Not reported | 1 | — |
| NSW Gas NetworkNew South Wales → New South Wales | Australia | Operating | 421 km | Not reported | 1 | — |
| Narrabri to Wellington PipelineNew South Wales → New South Wales | Australia | Cancelled | 83 km | 1.94 bcm/y | 1 | — |
| Neerabup Pipeline | Australia | Operating | 30 km | Not reported | 1 | — |
| North Queensland Gas PipelineQueensland → Queensland | Australia | Operating | 391 km | 1.08 bcm/y | 1 | 2004 |
| North West Shelf Gas Pipeline 1TLWestern Australia → Western Australia | Australia | Operating | 134 km | Not reported | 1 | 1983 |
| North West Shelf Gas Pipeline 2TLWestern Australia → Western Australia | Australia | Operating | 134 km | Not reported | 1 | 2003 |
| Northern Gas PipelineNorthern Territory → Queensland | Australia | Operating | 622 km | 8.91 bcm/y | 1 | 2019 |
| Northern Gas PipelineQueensland → Queensland | Australia | Cancelled | 580 km | 5.02 bcm/y | 1 | 2028 |
| Northern Gas PipelineNorthern Territory → Queensland | Australia | Cancelled | 622 km | 16.1 bcm/y | 1 | 2028 |
| Northern Gas PipelineNorthern Territory → Queensland | Australia | Cancelled | 0 km | 3.51 bcm/y | 1 | 2025 |
| Northern Goldfields Interconnect Gas PipelineWestern Australia → Western Australia | Australia | Operating | 580 km | 0.8 bcm/y | 1 | 2023 |
| Otway Gas PipelineVictoria → Victoria | Australia | Operating | 80 km | Not reported | 1 | 2006 |
| Palm Valley to Alice Springs PipelineNorthern Territory → Northern Teritory | Australia | Operating | 140 km | 0.3 bcm/y | 1 | 1983 |
| Papua New Guinea to Queensland Gas Pipeline | Papua New Guinea, Australia | Cancelled | 3,800 km | 6.13 bcm/y | 1 | 2001 |
| Parmelia Gas PipelineWestern Australia → Western Australia | Australia | Operating | 445 km | 0.7 bcm/y | 1 | 1972 |
| Pilbara Pipeline SystemWestern Australia → Western Australia | Australia | Operating | 251 km | 1.67 bcm/y | 1 | 1995 |
| Pluto LNG Export Gas PipelineWestern Australia → Western Australia | Australia | Operating | 181 km | Not reported | 1 | 2012 |
| Pluto-KPG Interconnector Gas PipelineWestern Australia → Western Australia | Australia | Operating | 3.2 km | 6.8 bcm/y | 1 | 2022 |
| Port Kembla Pipeline ProjectNew South Wales → New South Wales | Australia | Idle | 4.3 km | 4.87 bcm/y | 1 | 2023 |
| Port Kembla Pipeline ProjectNew South Wales → New South Wales | Australia | Idle | 7.8 km | 4.87 bcm/y | 1 | 2023 |
| Project Haber Gas PipelineWestern Australia → Western Australia | Australia | Cancelled | 120 km | 0.87 bcm/y | 1 | 2024 |
| Queensland Gas PipelineQueensland → Queensland | Australia | Operating | 629 km | 1.5 bcm/y | 1 | 1990 |
| Queensland Hunter Gas PipelineQueensland → New South Wales | Australia | Proposed | 833 km | 4.52 bcm/y | 1 | — |
| Queensland Hunter Gas PipelineNew South Wales → New South Wales | Australia | Proposed | 60 km | 2.01 bcm/y | 1 | — |
| Reedy Creek Wallumbilla PipelineQueensland → Queensland | Australia | Operating | 50 km | 3.01 bcm/y | 1 | 2018 |
| Riverland Pipeline SystemSouth Australia → South Australia | Australia | Operating | 237 km | 0.06 bcm/y | 1 | 1995 |
| Roma to Brisbane PipelineQueensland → Queensland | Australia | Operating | 438 km | 3.25 bcm/y | 1 | 1969 |
| Roma to Brisbane Pipeline | Australia | Operating | 121 km | Not reported | 1 | — |
| SEA Gas PipelineVictoria → South Australia | Australia | Operating | 687 km | 3.15 bcm/y | 1 | 2004 |
| SGP North Gas PipelineQueensland → Queensland | Australia | Under construction | 30 km | 1.21 bcm/y | 1 | 2026 |
| Scarborough Gas Pipeline | Australia | Proposed | 433 km | Not reported | 1 | 2026 |
| Silver Springs Pipeline | Australia | Operating | 101 km | 0.09 bcm/y | 1 | 1978 |
| South East Pipeline SystemVictoria → South Australia | Australia | Operating | 82 km | 0.15 bcm/y | 1 | 1991 |
| South East South Australia PipelineVictoria → South Australia | Australia | Operating | 45 km | 0.4 bcm/y | 1 | 2005 |
| South Erregulla Gas PipelineWestern Australia → Western Australia | Australia | Cancelled | 12 km | Not reported | 1 | 2024 |
| South Gippsland Natural Gas PipelineVictoria → Victoria | Australia | Operating | 250 km | 6.16 bcm/y | 1 | 2009 |
| South West Queensland PipelineQueensland → Queensland | Australia | Operating | 937 km | 4.05 bcm/y | 1 | 1996 |
| Spring Gully to Wallumbilla PipelineQueensland → Queensland | Australia | Operating | 87 km | 1.42 bcm/y | 1 | 2004 |
| Sturt Plateau PipelineNorthern Territory → Northern Territory | Australia | Proposed | 37 km | 0.5 bcm/y | 1 | 2026 |
| Tanami Gas PipelineNorthern Territory → Northern Territory | Australia | Operating | 440 km | 0.13 bcm/y | 1 | 2019 |
| Tasmanian Gas PipelineVictoria → Tasmania | Australia | Operating | 734 km | 1.29 bcm/y | 1 | 2002 |
| Telfer PipelineWestern Australia → Western Australia | Australia | Operating | 443 km | 0.29 bcm/y | 1 | 2004 |
| Telfer Pipeline | Australia | Operating | 45 km | Not reported | 1 | — |
| Thylacine Geographe Gas PipelineVictoria → Victoria | Australia | Operating | 70 km | 1.1 bcm/y | 1 | 2007 |
| Trans-Territory PipelineNorthern Territory → Northern Territory | Australia | Cancelled | 940 km | 1.07 bcm/y | 1 | — |
| Tubridgi Pipeline SystemWestern Australia → Western Australia | Australia | Mothballed | 87 km | 0.3 bcm/y | 1 | 1991 |
| Victoria Energy Terminal Gas PipelineVictoria → Victoria | Australia | Proposed | 19 km | Not reported | 1 | 2028 |
| Victorian Transmission SystemVictoria → Victoria | Australia | Operating | 2,035 km | 10.3 bcm/y | 1 | 1969 |
| Victorian Transmission SystemVictoria → Victoria | Australia | Operating | 51 km | Not reported | 1 | 2023 |
| Wallumbilla–Gladstone PipelineSouthern Queensland → Queensland | Australia | Operating | 540 km | Not reported | 1 | 2014 |
| West Erregulla Gas PipelineWestern Australia → Western Australia | Australia | Proposed | 17 km | 0.87 bcm/y | 1 | 2024 |
| West-East Gas PipelineWestern Australia → South Australia | Australia | Shelved | 2,900 km | 5.67 bcm/y | 1 | — |
| Western Slopes PipelineNew South Wales → New South Wales | Australia | Cancelled | 450 km | 2.01 bcm/y | 1 | 2026 |
| Wheatstone Ashburton West PipelineWestern Australia → Western Australia | Australia | Operating | 123 km | 3.38 bcm/y | 1 | 2015 |
| Wide Bay PipelineQueensland → Queensland | Australia | Operating | 274 km | 0.06 bcm/y | 1 | 2000 |
| Wodgina Lateral Gas PipelineWestern Australia → Western Australia | Australia | Operating | 85 km | Not reported | 1 | 2001 |
Companies headquartered in Australia
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.
More countries in Oceania
Ordered by number of tracked terminals, so countries next to each other here are of similar scale. The region is the one Global Energy Monitor gives this country's terminals.
In our rankings
Where this appears in the site's generated top lists. Each ranking page states its own method before its table.