Gas transmission pipeline · Newlands to Gladstone
Arrow Bowen Pipeline
Arrow Bowen Pipeline is a cancelled gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 580 km long and 15.05 bcm/y of capacity, starting up in 2028. It runs from Newlands to Gladstone. It is owned by Arrow Energy.
Length
580 km
Capacity
15.1 bcm/y
11.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Arrow Bowen Pipeline runs from Newlands to Gladstone. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Newlands
- To
- Gladstone
- Start country
- Australia
- End country
- Australia
- Countries crossed
- Australia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Oceania
- Route drawn on map
- 467 km
- GEM pipeline ID
- P1131
- Start year
- 2028
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Newlands → Gladstone | 580 | 15.1 | 1067 mm | 2028 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Fishermans Landing LNG Terminal | Australia | Export | Cancelled | 11.3 km | route proximity |
| Queensland Curtis LNG Terminal | Australia | Export | Operating | 15 km | route proximity |
| Australia Pacific LNG Terminal | Australia | Export | Operating | 15.2 km | route proximity |
| Gladstone LNG Terminal | Australia | Export | Operating | 15.7 km | route proximity |
| Arrow Energy LNG Terminal | Australia | Export | Cancelled | 17.2 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Arrow Energy100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Arrow Bowen Pipeline run?
- Arrow Bowen Pipeline runs from Newlands to Gladstone, crossing Australia.
- How long is Arrow Bowen Pipeline?
- Arrow Bowen Pipeline is 580 km long.
- How much gas can Arrow Bowen Pipeline carry?
- Arrow Bowen Pipeline has a design capacity of 15.1 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Arrow Bowen Pipeline operating?
- Arrow Bowen Pipeline is cancelled, with a reported start year of 2028.
- Who owns Arrow Bowen Pipeline?
- Arrow Bowen Pipeline is owned by Arrow Energy, as recorded in the current tracker release.
- Does Arrow Bowen Pipeline serve an LNG terminal?
- Arrow Bowen Pipeline passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.