Gas transmission pipeline · Northern Territory to Northern Territory
Beetaloo Lateral Pipeline
Beetaloo Lateral Pipeline is a cancelled gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 361 km long and 3.51 bcm/y of capacity, starting up in 2025. It runs from Northern Territory to Northern Territory.
Length
361 km
Capacity
3.51 bcm/y
2.6 Mtpa LNG equivalent
Segments tracked
1
Route
Beetaloo Lateral Pipeline runs from Northern Territory to Northern Territory. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Northern Territory
- To
- Northern Territory
- Start country
- Australia
- End country
- Australia
- Countries crossed
- Australia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 363 km
- GEM pipeline ID
- P3622
- Start year
- 2025
- Shelved (year GEM records)
- 2023
- Cancelled (year GEM records)
- 2025
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Northern Gas Pipeline (NGP) Lateral (1b) | Cancelled | Northern Territory → Northern Territory | 361 | 3.51 | — | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
In the news
Recent headlines that name Beetaloo Lateral Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Beetaloo Lateral Pipeline run?
- Beetaloo Lateral Pipeline runs from Northern Territory to Northern Territory, crossing Australia.
- How long is Beetaloo Lateral Pipeline?
- Beetaloo Lateral Pipeline is 361 km long.
- How much gas can Beetaloo Lateral Pipeline carry?
- Beetaloo Lateral Pipeline has a design capacity of 3.51 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Beetaloo Lateral Pipeline operating?
- Beetaloo Lateral Pipeline is cancelled, with a reported start year of 2025.
- Who owns Beetaloo Lateral Pipeline?
- Ownership of Beetaloo Lateral Pipeline is not reported in the current tracker release.
More gas pipelines in Australia
Listed in name order among the 148 pipelines tracked in Australia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Beetaloo Lateral PipelineNorthern Territory to Queensland · 749 km
- Beetaloo Lateral Pipeline0 km
- Beetaloo–McArthur River Connecting PipelineNorthern Territory to Northern Territory · 39 km
- BassGas PipelineVictoria to Victoria · 35 km
- Bayu-Undan to Darwin PipelineJDPA to Northern Territory · 502 km
- Beetaloo Lateral PipelineNorthern Territory to Northern Territory · 87 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.