Gas transmission pipeline · Equus Gas Project to Onslow

Equus Gas Pipeline

Equus Gas Pipeline is a cancelled gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 210 km long and 3.51 bcm/y of capacity, starting up in 2024. It runs from Equus Gas Project to Onslow. It is owned by Western Gas Corporation Pty Ltd.

Length

210 km

Capacity

3.51 bcm/y

2.6 Mtpa LNG equivalent

Segments tracked

1

Route

Equus Gas Pipeline runs from Equus Gas Project to Onslow. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Equus Gas Project
To
Onslow
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Oceania
Route drawn on map
144 km
GEM pipeline ID
P2074
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Original Equus FLNG Gas PipelineCancelledEquus Gas Project → Onslow2103.512024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Scarborough FLNG TerminalAustraliaExportCancelled0 kmroute proximity
Equus FLNG TerminalAustraliaExportCancelled10.9 kmroute proximity
Wheatstone LNG TerminalAustraliaExportOperating13.4 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Equus Gas Pipeline run?
Equus Gas Pipeline runs from Equus Gas Project to Onslow, crossing Australia.
How long is Equus Gas Pipeline?
Equus Gas Pipeline is 210 km long.
How much gas can Equus Gas Pipeline carry?
Equus Gas Pipeline has a design capacity of 3.51 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Equus Gas Pipeline operating?
Equus Gas Pipeline is cancelled, with a reported start year of 2024.
Who owns Equus Gas Pipeline?
Equus Gas Pipeline is owned by Western Gas Corporation Pty Ltd, as recorded in the current tracker release.
Does Equus Gas Pipeline serve an LNG terminal?
Equus Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.