Gas transmission pipeline · Queensland to Queensland

Brigalow Pipeline Project

Brigalow Pipeline Project is a proposed gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 23 km long, starting up in 2028. It runs from Queensland to Queensland. It is owned by APA Corp.

Length

23 km

Capacity

Not reported

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Brigalow Pipeline Project runs from Queensland to Queensland. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Queensland
To
Queensland
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
15 km
GEM pipeline ID
P7497
Start year
2028
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedQueensland → Queensland23Not reported914 mm2028GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cambodia LNG ProjectCambodiaImportCancelled—name match
Filipinas LNG Gateway Project FSRUPhilippinesImportUnder construction—name match
PAWA PNG FSRU ProjectPapua New GuineaImportShelved—name match
Project Venezuela LNG TerminalVenezuelaExportCancelled—name match
Yakutia LNG ProjectRussiaExportProposed—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Brigalow Pipeline Project run?
Brigalow Pipeline Project runs from Queensland to Queensland, crossing Australia.
How long is Brigalow Pipeline Project?
Brigalow Pipeline Project is 23 km long.
How much gas can Brigalow Pipeline Project carry?
No design capacity is reported for Brigalow Pipeline Project. That is an absent figure, not a zero.
Is Brigalow Pipeline Project operating?
Brigalow Pipeline Project is proposed, with a reported start year of 2028.
Who owns Brigalow Pipeline Project?
Brigalow Pipeline Project is owned by APA Corp, as recorded in the current tracker release.
Does Brigalow Pipeline Project serve an LNG terminal?
Brigalow Pipeline Project passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Australia

Listed in name order among the 148 pipelines tracked in Australia, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail