LNG Atlas

Export terminal · Queensland, Australia

Arrow Energy LNG Terminal

Arrow Energy LNG Terminal is a cancelled LNG export terminal in Queensland, Australia. The tracker lists 1 tracked unit; capacity is not reported. It is owned by CNPC and Shell.

Operating

—

no units operating

Under construction

—

no units under construction

Proposed

—

no units proposed

At a glance

Country
Australia
State / province
Queensland
Region
Oceania
Import / export
Export
Onshore / floating
Not reported
Status (rolled up)
Cancelled
Trains / phases tracked
1
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
23.6244° S, 151.1444° E
GEM terminal ID
T100000130326
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
T1-T4Cancelled1824.5——Pre-FIDPetroChina Co Ltd; Shell PLC

Capacity by status

StatusUnitsMtpabcm/y
Cancelled11824.5

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Owners

Parent companies

Reported cost

Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.

UnitStatusCapacityEstimated costPer tonne a year
T1-T4Cancelled18 Mtpa$10.9 billion15,000,000,000 AUD as reported$605

A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.

Location

Arrow Energy LNG Terminal at 23.6244° S, 151.1444° E, with 19 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
23.6244° S, 151.1444° E
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Papua New Guinea to Queensland Gas PipelineCancelled3,800 km6.13 bcm/y9.3 kmroute proximity
APLNG PipelineOperating530 km15.11 bcm/y14.2 kmroute proximity
GLNG PipelineOperating435 km13.85 bcm/y14.4 kmroute proximity
Queensland Gas PipelineOperating629 km1.5 bcm/y18.2 kmroute proximity
Wallumbilla–Gladstone PipelineOperating540 km—18.2 kmroute proximity
Wide Bay PipelineOperating274 km0.06 bcm/y21.8 kmroute proximity
Arrow Bowen PipelineCancelled580 km15.05 bcm/y23.5 kmroute proximity
Aspire Energy Express Gas PipelineProposed—3.07 bcm/y—name match
Blue Energy Bowen Gas PipelineProposed500 km3.01 bcm/y—name match
Guangdong Energy Group Yunhe Gas PipelineOperating39 km2.47 bcm/y—name match
Kinetica Energy ExpressOperating1,139 km——name match
Louisiana Energy Access Project PipelineOperating241 km10.22 bcm/y—name match
Louisiana Energy Access Project PipelineOperating0 km3.07 bcm/y—name match
Louisiana Energy Access Project PipelineOperating0 km4.09 bcm/y—name match
Louisiana Energy Access Project PipelineOperating0 km2.04 bcm/y—name match
Louisiana Energy Access Project PipelineUnder construction0 km2.04 bcm/y—name match
Louisiana Energy GatewayUnder construction209 km18.4 bcm/y—name match
Victoria Energy Terminal Gas PipelineProposed19 km——name match
Western Energy Storage and Transportation Header ProjectCancelled1,046 km20.44 bcm/y—name match

Vessels owned by the same companies

Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.

VesselViaStatusCapacityDelivered
Methane Nile EagleShellOperating145,000 m³2007
Methane Rita AndreaShellOperating145,000 m³2006
Shandong JuniperShellOperating135,000 m³2004

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Arrow Energy LNG Terminal?
Arrow Energy LNG Terminal is an LNG export terminal in Queensland, Australia. It is made up of 1 tracked train or phase.
Is Arrow Energy LNG Terminal operating?
Arrow Energy LNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
How much LNG can Arrow Energy LNG Terminal handle?
Global Energy Monitor reports no capacity for Arrow Energy LNG Terminal, so none is shown. That is an absent figure, not a zero.
Who owns Arrow Energy LNG Terminal?
Arrow Energy LNG Terminal is owned by CNPC and Shell. Shares are as recorded in the current tracker release.
What pipelines connect to Arrow Energy LNG Terminal?
19 tracked gas pipelines pass within 25 km of Arrow Energy LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail