Import terminal · Victoria, Australia
Crib Point FSRU Terminal
Crib Point FSRU Terminal is a cancelled LNG import terminal (floating storage and regasification unit (FSRU)) in Victoria, Australia. The tracker lists 1 tracked unit; capacity is not reported. It is owned by Leif Höegh & Co Ltd.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Cancelled | 1.75 | 2.38 | — | — | Pre-FID | Leif Höegh & Co Ltd [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 1.75 | 2.38 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Parent companies
Reported cost
Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.
| Unit | Status | Capacity | Estimated cost | Per tonne a year |
|---|---|---|---|---|
| Not reported | Cancelled | 1.75 Mtpa | $182 million250,000,000 AUD as reported | $104 |
A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.
Location
Crib Point FSRU Terminal at 38.3667° S, 145.3333° E, with 3 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 38.3667° S, 145.3333° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Crib Point Pakenham Pipeline | Cancelled | 60 km | 98.2 bcm/y | 6.5 km | route proximity |
| BassGas Pipeline | Operating | 35 km | — | 23.3 km | route proximity |
| South Gippsland Natural Gas Pipeline | Operating | 250 km | 6.16 bcm/y | 23.8 km | route proximity |
In the news
Recent headlines that name Crib Point FSRU Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Crib Point FSRU Terminal?
- Crib Point FSRU Terminal is an LNG import terminal in Victoria, Australia. It is made up of 1 tracked train or phase.
- Is Crib Point FSRU Terminal operating?
- Crib Point FSRU Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
- How much LNG can Crib Point FSRU Terminal handle?
- Global Energy Monitor reports no capacity for Crib Point FSRU Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Crib Point FSRU Terminal?
- Crib Point FSRU Terminal is owned by Leif Höegh & Co Ltd. Shares are as recorded in the current tracker release.
- What pipelines connect to Crib Point FSRU Terminal?
- 3 tracked gas pipelines pass within 25 km of Crib Point FSRU Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.