Ashburton Onslow Gas Pipeline is an operating gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 110 km long and 0.1 bcm/y of capacity, starting up in 2016. It runs from Nanutarra to Onslow Power Station.

Length

110 km

Capacity

0.1 bcm/y

0.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 152 mm (6.0 in)

Route

Ashburton Onslow Gas Pipeline runs from Nanutarra to Onslow Power Station. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Nanutarra
To
Onslow Power Station
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Oceania
Route drawn on map
106 km
GEM pipeline ID
P1184
Start year
2016
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingNanutarra → Onslow Power Station1100.1152 mm2016GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Wheatstone LNG TerminalAustraliaExportOperating8 kmroute proximity
Scarborough FLNG TerminalAustraliaExportCancelled18.5 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Ashburton Onslow Gas Pipeline run?
Ashburton Onslow Gas Pipeline runs from Nanutarra to Onslow Power Station, crossing Australia.
How long is Ashburton Onslow Gas Pipeline?
Ashburton Onslow Gas Pipeline is 110 km long.
How much gas can Ashburton Onslow Gas Pipeline carry?
Ashburton Onslow Gas Pipeline has a design capacity of 0.1 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Ashburton Onslow Gas Pipeline operating?
Ashburton Onslow Gas Pipeline is operating, having started in 2016.
Who owns Ashburton Onslow Gas Pipeline?
Ownership of Ashburton Onslow Gas Pipeline is not reported in the current tracker release.
Does Ashburton Onslow Gas Pipeline serve an LNG terminal?
Ashburton Onslow Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.