Gas transmission pipeline · Western Australia to Western Australia
Ashburton Onslow Gas Pipeline
Ashburton Onslow Gas Pipeline is an operating gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 110 km long and 0.1 bcm/y of capacity, starting up in 2016. It runs from Western Australia to Western Australia.
Length
110 km
Capacity
0.1 bcm/y
0.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 3871 mm (152 in)
Route
Ashburton Onslow Gas Pipeline runs from Western Australia to Western Australia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Western Australia
- To
- Western Australia
- Start country
- Australia
- End country
- Australia
- Countries crossed
- Australia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 106 km
- GEM pipeline ID
- P1184
- Start year
- 2016
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Western Australia → Western Australia | 110 | 0.1 | 3871 mm | 2016 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Wheatstone LNG Terminal | Australia | Export | Operating | 8 km | route proximity |
| Equus FLNG Terminal | Australia | Export | Cancelled | 18.5 km | route proximity |
| Scarborough FLNG Terminal | Australia | Export | Cancelled | 18.5 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
In the news
Recent headlines that name Ashburton Onslow Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Ashburton Onslow Gas Pipeline run?
- Ashburton Onslow Gas Pipeline runs from Western Australia to Western Australia, crossing Australia.
- How long is Ashburton Onslow Gas Pipeline?
- Ashburton Onslow Gas Pipeline is 110 km long.
- How much gas can Ashburton Onslow Gas Pipeline carry?
- Ashburton Onslow Gas Pipeline has a design capacity of 0.1 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Ashburton Onslow Gas Pipeline operating?
- Ashburton Onslow Gas Pipeline is operating, having started in 2016.
- Who owns Ashburton Onslow Gas Pipeline?
- Ownership of Ashburton Onslow Gas Pipeline is not reported in the current tracker release.
- Does Ashburton Onslow Gas Pipeline serve an LNG terminal?
- Ashburton Onslow Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Australia
Listed in name order among the 148 pipelines tracked in Australia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.