Export terminal · Western Australia, Australia
Wheatstone LNG Terminal
Wheatstone LNG Terminal is an operating LNG export terminal in Western Australia, Australia. The tracker lists 2 tracked units with 8.9 Mtpa operating, the earliest starting in 2017. Owners include JERA, Mitsubishi Corp, NYK and 5 others.
Operating
8.9 Mtpa
12.1 bcm/y · 2 units
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| T1 | Operating | 4.45 | 6.05 | 2017 | — | Not reported | JERA Co Inc [0%]; Mitsubishi Corp [3%]; NYK [0%]; Kyushu Electric Power Co Inc [1%]; Woodside Energy Group Ltd [13%]; JOGMEC [3%]; Chevron Corp [64%]; Kuwait Foreign Petroleum Exploration Co [13%] |
| T2 | Operating | 4.45 | 6.05 | 2018 | — | Not reported | JERA Co Inc [0%]; Mitsubishi Corp [3%]; NYK [0%]; Kyushu Electric Power Co Inc [1%]; Woodside Energy Group Ltd [13%]; JOGMEC [3%]; Chevron Corp [64%]; Kuwait Foreign Petroleum Exploration Co [13%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 2 | 8.9 | 12.1 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Parent companies
Operators
Location
Wheatstone LNG Terminal at 21.6979° S, 115.0011° E, with 4 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 21.6979° S, 115.0011° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Wheatstone Ashburton West Pipeline | Operating | 123 km | 3.38 bcm/y | 0.6 km | route proximity |
| Ashburton Onslow Gas Pipeline | Operating | 110 km | 0.1 bcm/y | 8 km | route proximity |
| Equus Gas Pipeline | Cancelled | 210 km | 3.51 bcm/y | 13.4 km | route proximity |
| Tubridgi Pipeline System | Mothballed | 87 km | 0.3 bcm/y | 15 km | route proximity |
Vessels owned by the same companies
Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.
Exposed to chokepoints
Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.
| Destination | Chokepoints on the usual route | Alternative route |
|---|---|---|
| East Asia | Lombok StraitMakassar StraitLarger vessels favour Lombok over the shallower Malacca route. | Strait of Malacca |
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Wheatstone LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Wheatstone LNG Terminal?
- Wheatstone LNG Terminal is an LNG export terminal in Western Australia, Australia. It is made up of 2 tracked trains and phases.
- Is Wheatstone LNG Terminal operating?
- Wheatstone LNG Terminal is operating, with its first tracked train starting in 2017.
- How much LNG can Wheatstone LNG Terminal handle?
- Wheatstone LNG Terminal has 8.9 Mtpa operating, equivalent to 12.1 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns Wheatstone LNG Terminal?
- Wheatstone LNG Terminal is owned by Chevron, Kuwait Foreign Petroleum Exploration Co, Woodside Energy and 5 others, and operated by Chevron. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Wheatstone LNG Terminal pass?
- Cargoes from Wheatstone LNG Terminal would normally pass Lombok Strait, Makassar Strait and Strait of Malacca. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Wheatstone LNG Terminal?
- 4 tracked gas pipelines pass within 25 km of Wheatstone LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
In our rankings
Where this appears in the site's generated top lists. Each ranking page states its own method before its table.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.