Gas transmission pipeline · Western Australia to Geraldton

Project Haber Gas Pipeline

Project Haber Gas Pipeline is a cancelled gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 120 km long and 0.87 bcm/y of capacity, starting up in 2024. It runs from Western Australia to Geraldton. It is owned by Strike Energy Ltd.

Length

120 km

Capacity

0.87 bcm/y

0.6 Mtpa LNG equivalent

Segments tracked

1

Route

Project Haber Gas Pipeline runs from Western Australia to Geraldton. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Western Australia
To
Geraldton
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Oceania
Route drawn on map
92 km
GEM pipeline ID
P5876
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledWestern Australia → Geraldton1200.872024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cambodia LNG ProjectCambodiaImportCancelledname match
Filipinas LNG Gateway Project FSRUPhilippinesImportShelvedname match
Project Venezuela LNG TerminalVenezuelaExportCancelledname match
Yakutia LNG ProjectRussiaExportShelvedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Project Haber Gas Pipeline run?
Project Haber Gas Pipeline runs from Western Australia to Geraldton, crossing Australia.
How long is Project Haber Gas Pipeline?
Project Haber Gas Pipeline is 120 km long.
How much gas can Project Haber Gas Pipeline carry?
Project Haber Gas Pipeline has a design capacity of 0.87 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Project Haber Gas Pipeline operating?
Project Haber Gas Pipeline is cancelled, with a reported start year of 2024.
Who owns Project Haber Gas Pipeline?
Project Haber Gas Pipeline is owned by Strike Energy Ltd, as recorded in the current tracker release.
Does Project Haber Gas Pipeline serve an LNG terminal?
Project Haber Gas Pipeline passes within 25 km of 4 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.