LNG Atlas

Gas transmission pipeline · New South Wales to New South Wales

Port Kembla Pipeline Project

Port Kembla Pipeline Project is an idle gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 4 km long and 4.87 bcm/y of capacity, starting up in 2023. It runs from New South Wales to New South Wales. It is owned by Australian Industrial Energy Pty Ltd.

Length

4.3 km

Capacity

4.87 bcm/y

3.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 457 mm (18 in)

Route

Port Kembla Pipeline Project runs from New South Wales to New South Wales. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
New South Wales
To
New South Wales
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
4.2 km
GEM pipeline ID
P2077
Start year
2023
Estimated cost (GEM, US dollars)
$50.8 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
PKGT to Springhill RoadIdleNew South Wales → New South Wales4.34.87457 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Port Kembla FSRUAustraliaImportUnder construction0 kmroute proximity
Cambodia LNG ProjectCambodiaImportCancelled—name match
Filipinas LNG Gateway Project FSRUPhilippinesImportUnder construction—name match
PAWA PNG FSRU ProjectPapua New GuineaImportShelved—name match
Project Venezuela LNG TerminalVenezuelaExportCancelled—name match
Yakutia LNG ProjectRussiaExportProposed—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Port Kembla Pipeline Project run?
Port Kembla Pipeline Project runs from New South Wales to New South Wales, crossing Australia.
How long is Port Kembla Pipeline Project?
Port Kembla Pipeline Project is 4.3 km long.
How much gas can Port Kembla Pipeline Project carry?
Port Kembla Pipeline Project has a design capacity of 4.87 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Port Kembla Pipeline Project operating?
Port Kembla Pipeline Project is idle, with a reported start year of 2023.
Who owns Port Kembla Pipeline Project?
Port Kembla Pipeline Project is owned by Australian Industrial Energy Pty Ltd, as recorded in the current tracker release.
Does Port Kembla Pipeline Project serve an LNG terminal?
Port Kembla Pipeline Project passes within 25 km of 6 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Australia

Listed in name order among the 148 pipelines tracked in Australia, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail