Gas transmission pipeline · Horsley Park to Kurri Kurri
Eastern Gas Pipeline
Eastern Gas Pipeline is a cancelled gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 185 km long and 3.01 bcm/y of capacity, starting up in 2023. It runs from Horsley Park to Kurri Kurri. It is owned by Jemena.
Length
185 km
Capacity
3.01 bcm/y
2.2 Mtpa LNG equivalent
Segments tracked
1
Route
Eastern Gas Pipeline runs from Horsley Park to Kurri Kurri. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Horsley Park
- To
- Kurri Kurri
- Start country
- Australia
- End country
- Australia
- Countries crossed
- Australia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Oceania
- Route drawn on map
- 135 km
- GEM pipeline ID
- P2073
- Start year
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Sydney to Hunter Valley Extension | Cancelled | Horsley Park → Kurri Kurri | 185 | 3.01 | — | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Newcastle FSRU | Australia | Import | Cancelled | 10.8 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Jemena100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Eastern Gas Pipeline run?
- Eastern Gas Pipeline runs from Horsley Park to Kurri Kurri, crossing Australia.
- How long is Eastern Gas Pipeline?
- Eastern Gas Pipeline is 185 km long.
- How much gas can Eastern Gas Pipeline carry?
- Eastern Gas Pipeline has a design capacity of 3.01 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Eastern Gas Pipeline operating?
- Eastern Gas Pipeline is cancelled, with a reported start year of 2023.
- Who owns Eastern Gas Pipeline?
- Eastern Gas Pipeline is owned by Jemena, as recorded in the current tracker release.
- Does Eastern Gas Pipeline serve an LNG terminal?
- Eastern Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.