Gas transmission pipeline · JDPA to Northern Territory
Bayu-Undan to Darwin Pipeline
Bayu-Undan to Darwin Pipeline is an idle gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 502 km long and 4.75 bcm/y of capacity, starting up in 2005. It runs from JDPA to Northern Territory. Owners include ConocoPhillips, Eni, Santos and 2 more.
Length
502 km
Capacity
4.75 bcm/y
3.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 660 mm (26 in)
Route
Bayu-Undan to Darwin Pipeline runs from JDPA to Northern Territory. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- JDPA
- To
- Northern Territory
- Start country
- Australia
- End country
- Australia
- Countries crossed
- Australia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 502 km
- GEM pipeline ID
- P1133
- Start year
- 2005
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Idle | JDPA → Northern Territory | 502 | 4.75 | 660 mm | 2005 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Darwin LNG Terminal | Australia | Export | Proposed | 0.6 km | route proximity |
| Northern Territory LNG Terminal | Australia | Export | Proposed | 10.7 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- ConocoPhillips56.72%
- Eni12.04%
- Santos10.64%
- Inpex10.52%
- Tokyo Electric Power Co10.08%
Parent companies
- ConocoPhillips56.72%
- Eni12.04%
- Santos10.64%
- Inpex10.52%
- Tokyo Electric Power Co10.08%
In the news
Recent headlines that name Bayu-Undan to Darwin Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Bayu-Undan to Darwin Pipeline run?
- Bayu-Undan to Darwin Pipeline runs from JDPA to Northern Territory, crossing Australia.
- How long is Bayu-Undan to Darwin Pipeline?
- Bayu-Undan to Darwin Pipeline is 502 km long.
- How much gas can Bayu-Undan to Darwin Pipeline carry?
- Bayu-Undan to Darwin Pipeline has a design capacity of 4.75 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Bayu-Undan to Darwin Pipeline operating?
- Bayu-Undan to Darwin Pipeline is idle, with a reported start year of 2005.
- Who owns Bayu-Undan to Darwin Pipeline?
- Bayu-Undan to Darwin Pipeline is owned by ConocoPhillips, Eni, Santos and 2 others, as recorded in the current tracker release.
- Does Bayu-Undan to Darwin Pipeline serve an LNG terminal?
- Bayu-Undan to Darwin Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Australia
Listed in name order among the 148 pipelines tracked in Australia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Beetaloo Lateral PipelineNorthern Territory to Northern Territory · 87 km
- Beetaloo Lateral PipelineNorthern Territory to Northern Territory · 361 km
- Beetaloo Lateral PipelineNorthern Territory to Queensland · 749 km
- Barossa Export Pipeline262 km
- Barossa Export Pipeline122 km
- BassGas PipelineVictoria to Victoria · 35 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.