Bayu-Undan to Darwin Pipeline

Bayu-Undan to Darwin Pipeline is an idle gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 502 km long and 4.75 bcm/y of capacity, starting up in 2005. It runs from Timor Sea to Darwin. Owners include ConocoPhillips, Eni, Santos Ltd and 2 more.

Length

502 km

Capacity

4.75 bcm/y

3.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 660 mm (26 in)

Route

Bayu-Undan to Darwin Pipeline runs from Timor Sea to Darwin. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Timor Sea
To
Darwin
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Oceania
Route drawn on map
502 km
GEM pipeline ID
P1133
Start year
2005
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineIdleTimor Sea → Darwin5024.75660 mm2005GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Darwin LNG TerminalAustraliaExportProposed0.6 kmroute proximity
Northern Territory LNG TerminalAustraliaExportShelved10.7 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Bayu-Undan to Darwin Pipeline run?
Bayu-Undan to Darwin Pipeline runs from Timor Sea to Darwin, crossing Australia.
How long is Bayu-Undan to Darwin Pipeline?
Bayu-Undan to Darwin Pipeline is 502 km long.
How much gas can Bayu-Undan to Darwin Pipeline carry?
Bayu-Undan to Darwin Pipeline has a design capacity of 4.75 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Bayu-Undan to Darwin Pipeline operating?
Bayu-Undan to Darwin Pipeline is idle, with a reported start year of 2005.
Who owns Bayu-Undan to Darwin Pipeline?
Bayu-Undan to Darwin Pipeline is owned by ConocoPhillips, Eni, Santos Ltd and 2 others, as recorded in the current tracker release.
Does Bayu-Undan to Darwin Pipeline serve an LNG terminal?
Bayu-Undan to Darwin Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.