Gas transmission pipeline · Queensland to Queensland
Galilee Gas Pipeline
Galilee Gas Pipeline is a cancelled gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 585 km long and 2.01 bcm/y of capacity, starting up in 2028. It runs from Queensland to Queensland. It is owned by Jemena.
Length
585 km
Capacity
2.01 bcm/y
1.5 Mtpa LNG equivalent
Segments tracked
1
Route
Galilee Gas Pipeline runs from Queensland to Queensland. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Queensland
- To
- Queensland
- Start country
- Australia
- End country
- Australia
- Countries crossed
- Australia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 581 km
- GEM pipeline ID
- P1361
- Start year
- 2028
- Estimated cost (GEM, US dollars)
- $436 million
- Cancelled (year GEM records)
- 2025
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Original Route | Cancelled | Queensland → Queensland | 585 | 2.01 | — | 2028 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Jemena100%
Parent companies
In the news
Recent headlines that name Galilee Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Galilee Gas Pipeline run?
- Galilee Gas Pipeline runs from Queensland to Queensland, crossing Australia.
- How long is Galilee Gas Pipeline?
- Galilee Gas Pipeline is 585 km long.
- How much gas can Galilee Gas Pipeline carry?
- Galilee Gas Pipeline has a design capacity of 2.01 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Galilee Gas Pipeline operating?
- Galilee Gas Pipeline is cancelled, with a reported start year of 2028.
- Who owns Galilee Gas Pipeline?
- Galilee Gas Pipeline is owned by Jemena, as recorded in the current tracker release.
More gas pipelines in Australia
Listed in name order among the 148 pipelines tracked in Australia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Galilee Gas Pipeline0 km
- Galilee Gas PipelineQueensland to Queensland · 420 km
- Galilee to Moranbah PipelineQueensland to Queensland · 240 km
- Equus Gas Pipeline200 km
- ERM Wellington PipelineNew South Wales to New South Wales · 219 km
- Fortescue River Gas PipelineWestern Australia to Western Australia · 270 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.