Gas transmission pipeline · Queensland to Queensland

Blue Energy Bowen Gas Pipeline

Blue Energy Bowen Gas Pipeline is a proposed gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 500 km long and 3.01 bcm/y of capacity, starting up in 2023. It runs from Queensland to Queensland. It is owned by Blue Energy.

Length

500 km

Capacity

3.01 bcm/y

2.2 Mtpa LNG equivalent

Segments tracked

1

Route

Blue Energy Bowen Gas Pipeline runs from Queensland to Queensland. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Queensland
To
Queensland
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
305 km
GEM pipeline ID
P2071
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedQueensland → Queensland5003.01—2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Andes Energy TerminalColombiaImportProposed—name match
Arrow Energy LNG TerminalAustraliaExportCancelled—name match
Batangas Clean Energy LNG TerminalPhilippinesImportProposed—name match
Caofeidian LNG Terminal (Beijing Energy)ChinaImportCancelled—name match
Fermeuse Energy FLNG TerminalCanadaExportProposed—name match
H-Energy Kakinada LNG TerminalIndiaImportShelved—name match
Ingleside Energy LNG TerminalUnited StatesExportCancelled—name match
Jiangyin LNG Terminal (Zhongtian Energy)ChinaImportShelved—name match
Liuheng LNG Terminal (Zhejiang Energy)ChinaImportUnder construction—name match
Main Pass Energy Hub FLNG TerminalUnited StatesExportCancelled—name match
NewTimes Energy LNG TerminalCanadaExportCancelled—name match
Safe Harbor Energy LNG TerminalUnited StatesImportCancelled—name match
Stewart Energy LNG TerminalCanadaExportCancelled—name match
Zeeland Energy FSRUNetherlandsImportProposed—name match
Zhangzhou LNG Terminal (China Energy Reserve)ChinaImportShelved—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Blue Energy Bowen Gas Pipeline run?
Blue Energy Bowen Gas Pipeline runs from Queensland to Queensland, crossing Australia.
How long is Blue Energy Bowen Gas Pipeline?
Blue Energy Bowen Gas Pipeline is 500 km long.
How much gas can Blue Energy Bowen Gas Pipeline carry?
Blue Energy Bowen Gas Pipeline has a design capacity of 3.01 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Blue Energy Bowen Gas Pipeline operating?
Blue Energy Bowen Gas Pipeline is proposed, with a reported start year of 2023.
Who owns Blue Energy Bowen Gas Pipeline?
Blue Energy Bowen Gas Pipeline is owned by Blue Energy, as recorded in the current tracker release.
Does Blue Energy Bowen Gas Pipeline serve an LNG terminal?
Blue Energy Bowen Gas Pipeline passes within 25 km of 15 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Australia

Listed in name order among the 148 pipelines tracked in Australia, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail