Export terminal · Texas, United States
Port Arthur LNG Terminal
Port Arthur LNG Terminal is an under construction LNG export terminal in Texas, United States. The tracker lists 4 tracked units with 13 Mtpa under construction, 13 Mtpa proposed. Owners include PALNG Common Facilities Company LLC, Port Arthur LNG LLC, Port Arthur LNG Phase II LLC and others.
Operating
—
no units operating
Under construction
13 Mtpa
17.7 bcm/y · 2 units
Proposed
13 Mtpa
17.7 bcm/y · 2 units
At a glance
- Country
- United States
- State / province
- Texas
- Region
- Americas
- Import / export
- Export
- Onshore / floating
- Not reported
- Status (rolled up)
- Under construction
- Trains / phases tracked
- 4
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 29.8117° N, 93.9596° W
- GEM terminal ID
- T100000130237
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| T1 | Under construction | 6.5 | 8.84 | — | — | FID | PALNG Common Facilities Company LLC; Port Arthur LNG LLC |
| T2 | Under construction | 6.5 | 8.84 | — | — | FID | PALNG Common Facilities Company LLC; Port Arthur LNG LLC |
| T3 | Proposed | 6.5 | 8.84 | — | — | FID | PALNG Common Facilities Company LLC; Port Arthur LNG Phase II LLC |
| T4 | Proposed | 6.5 | 8.84 | — | — | FID | PALNG Common Facilities Company LLC; Port Arthur LNG Phase II LLC |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Under construction | 2 | 13 | 17.7 |
| Proposed | 2 | 13 | 17.7 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- PALNG Common Facilities Company LLC
- Port Arthur LNG LLC(2/4 units)
- Port Arthur LNG Phase II LLC(2/4 units)
Parent companies
Reported cost
Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.
| Unit | Status | Capacity | Estimated cost | Per tonne a year |
|---|---|---|---|---|
| T1 | Under construction | 6.5 Mtpa | $6.5 billion | $1,000 |
| T2 | Under construction | 6.5 Mtpa | $6.5 billion | $1,000 |
| T3 | Proposed | 6.5 Mtpa | $7 billion | $1,077 |
| T4 | Proposed | 6.5 Mtpa | $7 billion | $1,077 |
Financing as GEM records it: JPMorgan Chase is the project's Financial Advisor
A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.
Location
Port Arthur LNG Terminal at 29.8117° N, 93.9596° W, with 66 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 29.8117° N, 93.9596° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Mustang Express Pipeline | Proposed | 286 km | — | 0.3 km | route proximity |
| Port Arthur Gas Pipeline | Proposed | 0 km | 0.72 bcm/y | 0.4 km | route proximity |
| Port Arthur Gas Pipeline | Proposed | 50 km | 20.44 bcm/y | 0.4 km | route proximity |
| Apex Pipeline | Proposed | 906 km | 20.44 bcm/y | 1 km | route proximity |
| Port Arthur Gas Pipeline | Proposed | 116 km | 20.44 bcm/y | 1.5 km | route proximity |
| Trident Gas Pipeline | Proposed | 348 km | 15.33 bcm/y | 1.5 km | route proximity |
| ANR Gas Pipeline | Operating | 2,897 km | 61.32 bcm/y | 4.2 km | route proximity |
| ANR Gas Pipeline | Operating | 0 km | 1.69 bcm/y | 4.2 km | route proximity |
| ANR Gas Pipeline | Proposed | 0 km | 1.28 bcm/y | 4.2 km | route proximity |
| ANR Gas Pipeline | Under construction | 0 km | 4.29 bcm/y | 4.2 km | route proximity |
| ANR Gas Pipeline | Proposed | 0 km | 0.74 bcm/y | 4.2 km | route proximity |
| ANR Gas Pipeline | Proposed | 1 km | 0 bcm/y | 4.2 km | route proximity |
| Golden Pass Gas Pipeline | Under construction | 111 km | 25.55 bcm/y | 5.1 km | route proximity |
| Tejas Gas Pipeline | Operating | 5,221 km | 1.23 bcm/y | 5.3 km | route proximity |
| Sabine Crossing Gas Pipeline | Proposed | 89 km | 27.59 bcm/y | 6.6 km | route proximity |
| Natural Gas Pipeline Company of America System | Operating | 14,645 km | 16.35 bcm/y | 7 km | route proximity |
| Natural Gas Pipeline Company of America System | Proposed | 0 km | 3.18 bcm/y | 7 km | route proximity |
| Bridgeline Gas Pipeline | Operating | 1,585 km | 9.4 bcm/y | 7.3 km | route proximity |
| Gulf Coast Southbound Pipeline | Under construction | 0 km | 2.66 bcm/y | 8 km | route proximity |
| Gulf Coast Southbound Pipeline | Operating | 2,227 km | 4.7 bcm/y | 8 km | route proximity |
| Gulf Coast Southbound Pipeline | Operating | 2 km | 0.72 bcm/y | 8 km | route proximity |
| Gulf Coast Southbound Pipeline | Operating | 0 km | 3.07 bcm/y | 8 km | route proximity |
| Sabine Natural Gas Pipeline System | Operating | 211 km | 2.4 bcm/y | 8.2 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 8,530 km | 10.83 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 14 km | 3.51 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Cancelled | 5 km | 0.3 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 5 km | 1.09 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 2 km | 0.71 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 777 km | 8.38 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 14 km | 0.53 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 11 km | 0.1 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 28 km | 0.97 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 1.02 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 53 km | 1.24 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 219 km | 1.33 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 24 km | 1.84 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 103 km | 3.05 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 0.82 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 224 km | 2.04 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 2 km | 0.63 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 1 km | 0.37 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 40 km | 2.81 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 1.79 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 1.02 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 0.99 bcm/y | 9.1 km | route proximity |
| Florida Gas Transmission Pipeline | Proposed | 0 km | 0.77 bcm/y | 9.1 km | route proximity |
| Creole Trail Pipeline | Operating | 151 km | 15.33 bcm/y | 10.9 km | route proximity |
| Creole Trail Pipeline | Proposed | 0 km | 9.5 bcm/y | 10.9 km | route proximity |
| Transcontinental Gas Pipeline | Operating | 10,200 km | 171.7 bcm/y | 10.9 km | route proximity |
| Transcontinental Gas Pipeline | Under construction | 0 km | 0.66 bcm/y | 10.9 km | route proximity |
| Transcontinental Gas Pipeline | Cancelled | 1 km | 1.94 bcm/y | 10.9 km | route proximity |
| Transcontinental Gas Pipeline | Cancelled | 10 km | 2.5 bcm/y | 10.9 km | route proximity |
| Transcontinental Gas Pipeline | Proposed | 13 km | 3.03 bcm/y | 10.9 km | route proximity |
| Transcontinental Gas Pipeline | Operating | 0 km | 4.85 bcm/y | 10.9 km | route proximity |
| Transcontinental Gas Pipeline | Operating | 0 km | 3.72 bcm/y | 10.9 km | route proximity |
| Transcontinental Gas Pipeline | Proposed | 0 km | 9.71 bcm/y | 10.9 km | route proximity |
| Transcontinental Gas Pipeline | Under construction | 0 km | 0.65 bcm/y | 10.9 km | route proximity |
| Transcontinental Gas Pipeline | Proposed | 0 km | 1.18 bcm/y | 10.9 km | route proximity |
| Transcontinental Gas Pipeline | Proposed | 26 km | 1.85 bcm/y | 10.9 km | route proximity |
| Creole Trail Pipeline | Cancelled | 168 km | 15.33 bcm/y | 11.2 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Operating | 14,202 km | 119.47 bcm/y | 22.4 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Proposed | 5 km | 12.88 bcm/y | 22.4 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Operating | 2 km | 0.18 bcm/y | 22.4 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Proposed | 0 km | 0.33 bcm/y | 22.4 km | route proximity |
| DeLa Express Pipeline | Proposed | 1,110 km | 20.44 bcm/y | 23.9 km | route proximity |
| Port Arthur Gas Pipeline | Shelved | 406 km | — | — | name match |
Exposed to chokepoints
Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.
| Destination | Chokepoints on the usual route | Alternative route |
|---|---|---|
| East Asia | Panama CanalPanama slot availability and draught decide between these; the Cape is the fallback. | Suez CanalStrait of Malacca |
| South Asia | Suez CanalBab el-Mandeb | Cape of Good Hope |
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Port Arthur LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Port Arthur LNG Terminal?
- Port Arthur LNG Terminal is an LNG export terminal in Texas, United States. It is made up of 4 tracked trains and phases.
- Is Port Arthur LNG Terminal operating?
- Port Arthur LNG Terminal is under construction. Nothing here should be read as a forecast that it will be built.
- How much LNG can Port Arthur LNG Terminal handle?
- Port Arthur LNG Terminal has 13 Mtpa under construction, 13 Mtpa proposed. Capacity at different statuses is never added together.
- Who owns Port Arthur LNG Terminal?
- Port Arthur LNG Terminal is owned by PALNG Common Facilities Company LLC, Port Arthur LNG LLC and Port Arthur LNG Phase II LLC. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Port Arthur LNG Terminal pass?
- Cargoes from Port Arthur LNG Terminal would normally pass Panama Canal, Suez Canal, Bab el-Mandeb, Strait of Malacca and 1 other. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Port Arthur LNG Terminal?
- 66 tracked gas pipelines pass within 25 km of Port Arthur LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.