LNG Atlas

Gas transmission pipeline · Louisiana to Louisiana

Creole Trail Pipeline

Creole Trail Pipeline is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 0 km long and 9.5 bcm/y of capacity, starting up in 2031. It runs from Louisiana to Louisiana. It is owned by Cheniere Energy.

Length

0 km

Capacity

9.5 bcm/y

7.0 Mtpa LNG equivalent

Segments tracked

1

Route

Creole Trail Pipeline runs from Louisiana to Louisiana. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Louisiana
To
Louisiana
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
307 km
GEM pipeline ID
P7797
Start year
2031
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
CPTL Expansion ProjectProposedLouisiana → Louisiana09.5—2031GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Beacon Port LNG TerminalUnited StatesImportCancelled0.1 kmroute proximity
G2 LNG TerminalUnited StatesExportCancelled0.7 kmroute proximity
Woodside Louisiana LNG TerminalUnited StatesExportUnder construction1.1 kmroute proximity
Sabine Pass LNG TerminalUnited StatesExportOperating1.5 kmroute proximity
Cameron LNG TerminalUnited StatesExportOperating1.9 kmroute proximity
Monkey Island LNG TerminalUnited StatesExportProposed1.9 kmroute proximity
Commonwealth LNG TerminalUnited StatesExportProposed3.6 kmroute proximity
Calcasieu Pass LNG TerminalUnited StatesExportOperating3.9 kmroute proximity
Magnolia LNG TerminalUnited StatesExportProposed4.4 kmroute proximity
CP2 LNG TerminalUnited StatesExportUnder construction4.6 kmroute proximity
Golden Pass LNG TerminalUnited StatesExportUnder construction5.5 kmroute proximity
Lake Charles LNG TerminalUnited StatesExportProposed6.3 kmroute proximity
Port Arthur LNG TerminalUnited StatesExportUnder construction10.9 kmroute proximity
Creole Trail LNG TerminalUnited StatesImportCancelled11.3 kmroute proximity
Gulf Gateway Deepwater Port LNG TerminalUnited StatesImportRetired11.3 kmroute proximity
Alturas LNG TerminalUnited StatesExportCancelled15.6 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Creole Trail Pipeline run?
Creole Trail Pipeline runs from Louisiana to Louisiana, crossing United States.
How long is Creole Trail Pipeline?
No length is reported for Creole Trail Pipeline and no route geometry is available to measure one from.
How much gas can Creole Trail Pipeline carry?
Creole Trail Pipeline has a design capacity of 9.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Creole Trail Pipeline operating?
Creole Trail Pipeline is proposed, with a reported start year of 2031.
Who owns Creole Trail Pipeline?
Creole Trail Pipeline is owned by Cheniere Energy, as recorded in the current tracker release.
Does Creole Trail Pipeline serve an LNG terminal?
Creole Trail Pipeline passes within 25 km of 16 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in United States

Listed in name order among the 515 pipelines tracked in United States, so projects with the same name sit together. A browse aid, not a claim that they are alike.