LNG Atlas

Import terminal · Louisiana, United States

Beacon Port LNG Terminal

Beacon Port LNG Terminal is a cancelled LNG import terminal in Louisiana, United States. The tracker lists 1 tracked unit; capacity is not reported. It is owned by ConocoPhillips.

Operating

—

no units operating

Under construction

—

no units under construction

Proposed

—

no units proposed

At a glance

State / province
Louisiana
Region
Americas
Import / export
Import
Onshore / floating
Not reported
Status (rolled up)
Cancelled
Trains / phases tracked
1
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
29.7631° N, 93.6986° W
GEM terminal ID
T100000130844
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedCancelled11.515.7——Not reportedConocoPhillips Corp [100%]

Capacity by status

StatusUnitsMtpabcm/y
Cancelled111.515.6

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Owners

Parent companies

Location

Beacon Port LNG Terminal at 29.7631° N, 93.6986° W, with 35 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
29.7631° N, 93.6986° W
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Creole Trail PipelineCancelled168 km15.33 bcm/y0.1 kmroute proximity
Creole Trail PipelineProposed0 km9.5 bcm/y0.1 kmroute proximity
Transcontinental Gas PipelineOperating10,200 km171.7 bcm/y0.1 kmroute proximity
Transcontinental Gas PipelineUnder construction0 km0.66 bcm/y0.1 kmroute proximity
Transcontinental Gas PipelineCancelled1 km1.94 bcm/y0.1 kmroute proximity
Transcontinental Gas PipelineCancelled10 km2.5 bcm/y0.1 kmroute proximity
Transcontinental Gas PipelineProposed13 km3.03 bcm/y0.1 kmroute proximity
Transcontinental Gas PipelineOperating0 km4.85 bcm/y0.1 kmroute proximity
Transcontinental Gas PipelineOperating0 km3.72 bcm/y0.1 kmroute proximity
Transcontinental Gas PipelineProposed0 km9.71 bcm/y0.1 kmroute proximity
Transcontinental Gas PipelineUnder construction0 km0.65 bcm/y0.1 kmroute proximity
Transcontinental Gas PipelineProposed0 km1.18 bcm/y0.1 kmroute proximity
Transcontinental Gas PipelineProposed26 km1.85 bcm/y0.1 kmroute proximity
ANR Gas PipelineOperating2,897 km61.32 bcm/y0.2 kmroute proximity
ANR Gas PipelineOperating0 km1.69 bcm/y0.2 kmroute proximity
ANR Gas PipelineProposed0 km1.28 bcm/y0.2 kmroute proximity
ANR Gas PipelineUnder construction0 km4.29 bcm/y0.2 kmroute proximity
ANR Gas PipelineProposed0 km0.74 bcm/y0.2 kmroute proximity
ANR Gas PipelineProposed1 km0 bcm/y0.2 kmroute proximity
Bridgeline Gas PipelineOperating1,585 km9.4 bcm/y1.2 kmroute proximity
Creole Trail PipelineOperating151 km15.33 bcm/y1.6 kmroute proximity
UTOS Gas PipelineIdle47 km20.44 bcm/y2.5 kmroute proximity
Natural Gas Pipeline Company of America SystemOperating14,645 km16.35 bcm/y2.9 kmroute proximity
Natural Gas Pipeline Company of America SystemProposed0 km3.18 bcm/y2.9 kmroute proximity
Kinetica Energy ExpressOperating1,139 km—4.6 kmroute proximity
Columbia Gulf Transmission PipelineOperating5,360 km—5.8 kmroute proximity
Stingray Gas PipelineOperating523 km12.26 bcm/y8.7 kmroute proximity
Sabine Crossing Gas PipelineProposed89 km27.59 bcm/y16.1 kmroute proximity
Apex PipelineProposed906 km20.44 bcm/y20.5 kmroute proximity
Port Arthur Gas PipelineProposed116 km20.44 bcm/y22.2 kmroute proximity
Port Arthur Gas PipelineProposed0 km0.72 bcm/y22.2 kmroute proximity
Golden Pass Gas PipelineUnder construction111 km25.55 bcm/y22.7 kmroute proximity
Trident Gas PipelineProposed348 km15.33 bcm/y22.8 kmroute proximity
Mustang Express PipelineProposed286 km—24.1 kmroute proximity
Port Arthur Gas PipelineProposed50 km20.44 bcm/y24.8 kmroute proximity

Supplied via

Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Beacon Port LNG Terminal?
Beacon Port LNG Terminal is an LNG import terminal in Louisiana, United States. It is made up of 1 tracked train or phase.
Is Beacon Port LNG Terminal operating?
Beacon Port LNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
How much LNG can Beacon Port LNG Terminal handle?
Global Energy Monitor reports no capacity for Beacon Port LNG Terminal, so none is shown. That is an absent figure, not a zero.
Who owns Beacon Port LNG Terminal?
Beacon Port LNG Terminal is owned by ConocoPhillips. Shares are as recorded in the current tracker release.
Which maritime chokepoints do cargoes from Beacon Port LNG Terminal pass?
Cargoes from Beacon Port LNG Terminal would normally pass Panama Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
What pipelines connect to Beacon Port LNG Terminal?
35 tracked gas pipelines pass within 25 km of Beacon Port LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail