Gas transmission pipeline · Refugio County to Fort Bend County
Tejas Gas Pipeline
Tejas Gas Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 5,221 km long and 1.23 bcm/y of capacity, starting up in 1953. It runs from Refugio County to Fort Bend County. It is owned by Kinder Morgan Inc.
Length
5,221 km
Capacity
1.23 bcm/y
0.9 Mtpa LNG equivalent
Segments tracked
1
Route
Tejas Gas Pipeline runs from Refugio County to Fort Bend County. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Refugio County
- To
- Fort Bend County
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 2,640 km
- GEM pipeline ID
- P0258
- Start year
- 1953
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Refugio County → Fort Bend County | 5,221 | 1.23 | — | 1953 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Alturas LNG Terminal | United States | Export | Cancelled | 0.4 km | route proximity |
| Galveston Bay LNG Terminal | United States | Export | Cancelled | 3.5 km | route proximity |
| Bay Crossing LNG Terminal | United States | Import | Cancelled | 4.9 km | route proximity |
| Port Arthur LNG Terminal | United States | Export | Under construction | 5.3 km | route proximity |
| Phillips 66 Beamont Oil Terminal | United States | Export | Operating | 11.8 km | route proximity |
| Golden Pass LNG Terminal | United States | Export | Operating | 12 km | route proximity |
| Sabine Pass LNG Terminal | United States | Export | Operating | 14.6 km | route proximity |
| Coastal Bend LNG Terminal | United States | Export | Proposed | 19.2 km | route proximity |
| South Texas LNG Terminal | United States | Export | Cancelled | 19.7 km | route proximity |
| Ingleside Energy LNG Terminal | United States | Export | Cancelled | 24.4 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Tejas Gas Pipeline run?
- Tejas Gas Pipeline runs from Refugio County to Fort Bend County, crossing United States.
- How long is Tejas Gas Pipeline?
- Tejas Gas Pipeline is 5,221 km long.
- How much gas can Tejas Gas Pipeline carry?
- Tejas Gas Pipeline has a design capacity of 1.23 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Tejas Gas Pipeline operating?
- Tejas Gas Pipeline is operating, having started in 1953.
- Who owns Tejas Gas Pipeline?
- Tejas Gas Pipeline is owned by Kinder Morgan Inc, as recorded in the current tracker release.
- Does Tejas Gas Pipeline serve an LNG terminal?
- Tejas Gas Pipeline passes within 25 km of 10 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.