Gas transmission pipeline · Refugio County to Fort Bend County

Tejas Gas Pipeline

Tejas Gas Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 5,221 km long and 1.23 bcm/y of capacity, starting up in 1953. It runs from Refugio County to Fort Bend County. It is owned by Kinder Morgan Inc.

Length

5,221 km

Capacity

1.23 bcm/y

0.9 Mtpa LNG equivalent

Segments tracked

1

Route

Tejas Gas Pipeline runs from Refugio County to Fort Bend County. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Refugio County
To
Fort Bend County
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
2,640 km
GEM pipeline ID
P0258
Start year
1953
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingRefugio County → Fort Bend County5,2211.231953GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Alturas LNG TerminalUnited StatesExportCancelled0.4 kmroute proximity
Galveston Bay LNG TerminalUnited StatesExportCancelled3.5 kmroute proximity
Bay Crossing LNG TerminalUnited StatesImportCancelled4.9 kmroute proximity
Port Arthur LNG TerminalUnited StatesExportUnder construction5.3 kmroute proximity
Phillips 66 Beamont Oil TerminalUnited StatesExportOperating11.8 kmroute proximity
Golden Pass LNG TerminalUnited StatesExportOperating12 kmroute proximity
Sabine Pass LNG TerminalUnited StatesExportOperating14.6 kmroute proximity
Coastal Bend LNG TerminalUnited StatesExportProposed19.2 kmroute proximity
South Texas LNG TerminalUnited StatesExportCancelled19.7 kmroute proximity
Ingleside Energy LNG TerminalUnited StatesExportCancelled24.4 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Tejas Gas Pipeline run?
Tejas Gas Pipeline runs from Refugio County to Fort Bend County, crossing United States.
How long is Tejas Gas Pipeline?
Tejas Gas Pipeline is 5,221 km long.
How much gas can Tejas Gas Pipeline carry?
Tejas Gas Pipeline has a design capacity of 1.23 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Tejas Gas Pipeline operating?
Tejas Gas Pipeline is operating, having started in 1953.
Who owns Tejas Gas Pipeline?
Tejas Gas Pipeline is owned by Kinder Morgan Inc, as recorded in the current tracker release.
Does Tejas Gas Pipeline serve an LNG terminal?
Tejas Gas Pipeline passes within 25 km of 10 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.