Gas transmission pipeline · Texas to Florida
Florida Gas Transmission Pipeline
Florida Gas Transmission Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 8,530 km long and 10.83 bcm/y of capacity, starting up in 1998. It runs from Texas to Florida. It is owned by Florida Gas Transmission Co LLC.
Length
8,530 km
Capacity
10.8 bcm/y
8.0 Mtpa LNG equivalent
Segments tracked
1
Route
Florida Gas Transmission Pipeline runs from Texas to Florida. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Texas
- To
- Florida
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 8,610 km
- GEM pipeline ID
- P0190
- Start year
- 1998
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| SYSTEM/NETWORK INFO | Operating | Texas → Florida | 8,530 | 10.8 | — | 1998 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| American LNG Hialeah Terminal | United States | Export | Operating | 0.1 km | route proximity |
| Calypso LNG Terminal | United States | Import | Cancelled | 1.2 km | route proximity |
| Corpus Christi LNG Terminal | United States | Export | Operating | 2.8 km | route proximity |
| American LNG Titusville Terminal | United States | Export | Cancelled | 3.5 km | route proximity |
| Strom LNG Terminal | United States | Export | Cancelled | 3.5 km | route proximity |
| Alturas LNG Terminal | United States | Export | Cancelled | 3.7 km | route proximity |
| Ingleside Energy LNG Terminal | United States | Export | Cancelled | 4.5 km | route proximity |
| Coastal Bend LNG Terminal | United States | Export | Proposed | 7.2 km | route proximity |
| Vista Del Sol LNG Terminal | United States | Import | Cancelled | 8 km | route proximity |
| Port Arthur LNG Terminal | United States | Export | Under construction | 9.1 km | route proximity |
| Point Comfort LNG Terminal | United States | Export | Cancelled | 9.9 km | route proximity |
| Port Dolphin LNG Terminal | United States | Import | Cancelled | 9.9 km | route proximity |
| Calhoun LNG Terminal | United States | Import | Cancelled | 10.3 km | route proximity |
| Port Lavaca FLNG Terminal | United States | Export | Cancelled | 10.3 km | route proximity |
| Floridian LNG Terminal | United States | Export | Cancelled | 10.4 km | route proximity |
| Galveston Bay LNG Terminal | United States | Export | Cancelled | 10.4 km | route proximity |
| South Texas LNG Terminal | United States | Export | Cancelled | 11.7 km | route proximity |
| Eagle LNG Terminal | United States | Export | Proposed | 12.8 km | route proximity |
| Golden Pass LNG Terminal | United States | Export | Under construction | 15.6 km | route proximity |
| Sabine Pass LNG Terminal | United States | Export | Operating | 18.3 km | route proximity |
| Lake Charles LNG Terminal | United States | Export | Proposed | 20.7 km | route proximity |
| Magnolia LNG Terminal | United States | Export | Proposed | 21.8 km | route proximity |
| Woodside Louisiana LNG Terminal | United States | Export | Under construction | 22 km | route proximity |
| Bay Crossing LNG Terminal | United States | Import | Cancelled | 22.2 km | route proximity |
| Freeport LNG Terminal | United States | Export | Operating | 24 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Florida Gas Transmission Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Florida Gas Transmission Pipeline run?
- Florida Gas Transmission Pipeline runs from Texas to Florida, crossing United States.
- How long is Florida Gas Transmission Pipeline?
- Florida Gas Transmission Pipeline is 8,530 km long.
- How much gas can Florida Gas Transmission Pipeline carry?
- Florida Gas Transmission Pipeline has a design capacity of 10.8 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Florida Gas Transmission Pipeline operating?
- Florida Gas Transmission Pipeline is operating, having started in 1998.
- Who owns Florida Gas Transmission Pipeline?
- Florida Gas Transmission Pipeline is owned by Florida Gas Transmission Co LLC, as recorded in the current tracker release.
- Does Florida Gas Transmission Pipeline serve an LNG terminal?
- Florida Gas Transmission Pipeline passes within 25 km of 25 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in United States
Listed in name order among the 515 pipelines tracked in United States, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Florida Gas Transmission PipelineLouisiana to Louisiana · 0 km
- Florida Gas Transmission PipelineFlorida to Florida · 30 km
- Florida Gas Transmission PipelineFlorida to Alabama · 14 km
- Equitrans Gas Pipeline47 km
- Evangeline Pass Gas PipelineLouisiana to Louisiana · 21 km
- Fayetteville Express Gas PipelineArkansas to Mississippi · 298 km
In our rankings
Where this appears in the site's generated top lists. Each ranking page states its own method before its table.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.