Gas transmission pipeline · Midline County to Jefferson County
Apex Pipeline
Apex Pipeline is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 906 km long and 20.44 bcm/y of capacity. It runs from Midline County to Jefferson County. It is owned by Terga Resources.
Length
906 km
Capacity
20.4 bcm/y
15.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Apex Pipeline runs from Midline County to Jefferson County. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Midline County
- To
- Jefferson County
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 890 km
- GEM pipeline ID
- P5931
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Midline County → Jefferson County | 906 | 20.4 | 1067 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Golden Pass LNG Terminal | United States | Export | Operating | 0.1 km | route proximity |
| Port Arthur LNG Terminal | United States | Export | Under construction | 1 km | route proximity |
| Sabine Pass LNG Terminal | United States | Export | Operating | 3.6 km | route proximity |
| Alturas LNG Terminal | United States | Export | Cancelled | 7.7 km | route proximity |
| Phillips 66 Beamont Oil Terminal | United States | Export | Operating | 16.5 km | route proximity |
| Beacon Port LNG Terminal | United States | Import | Cancelled | 20.5 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Terga Resources100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Apex Pipeline run?
- Apex Pipeline runs from Midline County to Jefferson County, crossing United States.
- How long is Apex Pipeline?
- Apex Pipeline is 906 km long.
- How much gas can Apex Pipeline carry?
- Apex Pipeline has a design capacity of 20.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Apex Pipeline operating?
- Apex Pipeline is proposed.
- Who owns Apex Pipeline?
- Apex Pipeline is owned by Terga Resources, as recorded in the current tracker release.
- Does Apex Pipeline serve an LNG terminal?
- Apex Pipeline passes within 25 km of 6 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.