Gas transmission pipeline · Delaware to Pennsylvania
Texas Eastern Transmission (TETCO) Gas Pipeline
Texas Eastern Transmission (TETCO) Gas Pipeline is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 0 km long and 0.33 bcm/y of capacity, starting up in 2027. It runs from Delaware to Pennsylvania. It is owned by Enbridge Inc.
Length
0 km
Capacity
0.33 bcm/y
0.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Texas Eastern Transmission (TETCO) Gas Pipeline runs from Delaware to Pennsylvania. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Delaware
- To
- Pennsylvania
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 12,463 km
- GEM pipeline ID
- P7813
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Appalachia to Market III Project | Proposed | Delaware → Pennsylvania | 0 | 0.33 | 914 mm | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Coastal Bend LNG Terminal | United States | Export | Proposed | 0.2 km | route proximity |
| Penn LNG Terminal | United States | Export | Proposed | 4 km | route proximity |
| South Texas LNG Terminal | United States | Export | Cancelled | 4.9 km | route proximity |
| Corpus Christi LNG Terminal | United States | Export | Operating | 5.2 km | route proximity |
| CE FLNG Terminal | United States | Export | Cancelled | 6.3 km | route proximity |
| Point Comfort LNG Terminal | United States | Export | Cancelled | 7 km | route proximity |
| Gibbstown Deepwater Port LNG Terminal | United States | Export | Proposed | 7.9 km | route proximity |
| Calhoun LNG Terminal | United States | Import | Cancelled | 8.6 km | route proximity |
| Port Lavaca FLNG Terminal | United States | Export | Cancelled | 8.6 km | route proximity |
| Louisiana LNG Terminal | United States | Export | Cancelled | 12.2 km | route proximity |
| Ingleside Energy LNG Terminal | United States | Export | Cancelled | 13.4 km | route proximity |
| Vista Del Sol LNG Terminal | United States | Import | Cancelled | 13.7 km | route proximity |
| Main Pass Energy Hub FLNG Terminal | United States | Export | Cancelled | 14.9 km | route proximity |
| Creole Trail LNG Terminal | United States | Import | Cancelled | 15.8 km | route proximity |
| Gulf Gateway Deepwater Port LNG Terminal | United States | Import | Retired | 15.8 km | route proximity |
| Alturas LNG Terminal | United States | Export | Cancelled | 17.1 km | route proximity |
| West Delta LNG Deepwater Port Terminal | United States | Export | Proposed | 18.4 km | route proximity |
| Plaquemines LNG Terminal | United States | Export | Operating | 18.5 km | route proximity |
| Delta LNG Terminal | United States | Export | Cancelled | 18.6 km | route proximity |
| Gulfstream LNG Terminal | United States | Export | Proposed | 19.3 km | route proximity |
| Lake Charles LNG Terminal | United States | Export | Proposed | 21.6 km | route proximity |
| Port Arthur LNG Terminal | United States | Export | Under construction | 22.4 km | route proximity |
| Magnolia LNG Terminal | United States | Export | Proposed | 22.5 km | route proximity |
| Crown Landing LNG Terminal | United States | Import | Cancelled | 22.7 km | route proximity |
| Woodside Louisiana LNG Terminal | United States | Export | Under construction | 23.1 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Enbridge Inc100%
In the news
Recent headlines that name Texas Eastern Transmission (TETCO) Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Texas Eastern Transmission (TETCO) Gas Pipeline run?
- Texas Eastern Transmission (TETCO) Gas Pipeline runs from Delaware to Pennsylvania, crossing United States.
- How long is Texas Eastern Transmission (TETCO) Gas Pipeline?
- No length is reported for Texas Eastern Transmission (TETCO) Gas Pipeline and no route geometry is available to measure one from.
- How much gas can Texas Eastern Transmission (TETCO) Gas Pipeline carry?
- Texas Eastern Transmission (TETCO) Gas Pipeline has a design capacity of 0.33 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Texas Eastern Transmission (TETCO) Gas Pipeline operating?
- Texas Eastern Transmission (TETCO) Gas Pipeline is proposed, with a reported start year of 2027.
- Who owns Texas Eastern Transmission (TETCO) Gas Pipeline?
- Texas Eastern Transmission (TETCO) Gas Pipeline is owned by Enbridge Inc, as recorded in the current tracker release.
- Does Texas Eastern Transmission (TETCO) Gas Pipeline serve an LNG terminal?
- Texas Eastern Transmission (TETCO) Gas Pipeline passes within 25 km of 25 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in United States
Listed in name order among the 515 pipelines tracked in United States, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Texas Gas Transmission PipelineLouisana to Indiana, Illinois, Ohio · 9,616 km
- Texas Gas Transmission PipelineKentuky to Tennesse · 37 km
- Texas Gas Transmission PipelineOhio to Ohio · 292 km
- Texas Eastern Transmission (TETCO) Gas PipelineLouisiana to Louisiana · 4.8 km
- Texas Eastern Transmission (TETCO) Gas PipelineWest Virginia to Pennsylvania · 28 km
- Texas Eastern Transmission (TETCO) Gas PipelinePennsylvania to Pennsylvania · 1.6 km