Country
Colombia: LNG infrastructure
Colombia has 10 LNG terminals and 40 tracked gas pipelines in the Global Energy Monitor tracker. It is an importer, with 3.45 Mtpa of operating regasification capacity and no operating liquefaction.
Export capacity
—
operating liquefaction
Import capacity
3.45 Mtpa
operating regasification
Pipelines
40
43,856 km tracked
Fleet
0
0 owned from here (flag not reported this release)
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 1 | — | — |
| Import (regasification) | 9 | 3.45 | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Colombia
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Andes Energy TerminalValle del Cauca | Import | Floating | Proposed | Not reported | 1 | — |
| Ballena FSRULa Guajira | Import | FSRU | Proposed | 1.99 Mtpaproposed | 1 | — |
| Buenaventura FSRU | Import | FSRU | Proposed | 0.46 Mtpaproposed | 1 | — |
| Caribe LNG FSU | Import | Floating | Proposed | Not reported | 1 | — |
| Cartagena FSRU (Colombia)Bolivar | Import | FSRU | Operating | 3.45 Mtpa | 3 | 2016 |
| Ciénaga FSRUMagdalena | Import | FSRU | Proposed | 3.07 Mtpaproposed | 1 | — |
| Colombia FLNG Terminal | Export | FLNG | Cancelled | Not reported | 1 | — |
| Coveñas FSRUSucre | Import | FSRU | Proposed | 4.07 Mtpaproposed | 2 | — |
| El Viajano Altenesol LNG TerminalCordoba | Import | Not reported | Cancelled | Not reported | 1 | — |
| Puerto Brisa LNG TerminalLa Guajira | Import | Floating | Proposed | 4.91 Mtpaproposed | 2 | — |
Gas pipelines crossing Colombia
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Bogotá - SNT Magdalena MedioCundinamarca → Tolima | Colombia | Proposed | 105 km | 2.2 bcm/y | 1 | 2030 |
| Buenaventura-Yumbo Gas PipelineValle del Cauca → Valle del Cauca | Colombia | Proposed | 100 km | 4.09 bcm/y | 1 | 2030 |
| Cúcuta - SNT Magdalena MedioNorte de Santander → Cesar | Colombia | Proposed | 100 km | 0.08 bcm/y | 1 | 2030 |
| Northwestern Gas PipelineCórdoba → Antioquia | Colombia | Cancelled | 289 km | 1.02 bcm/y | 1 | 2023 |
| Northwestern Gas PipelineAntioquia → Tolima | Colombia | Cancelled | 139 km | Not reported | 1 | 2028 |
| Northwestern Gas PipelineTolima → Cundinamarca | Colombia | Cancelled | 105 km | Not reported | 1 | 2028 |
| ProgasurValle del Cauca → Cauca | Colombia | Proposed | Not reported | 0.03 bcm/y | 1 | — |
| ProgasurTolima → Cundinamarca | Colombia | Proposed | Not reported | 0.02 bcm/y | 1 | — |
| Progasur Gas Pipeline | Colombia | Operating | 288 km | Not reported | 1 | — |
| Promigas Pipeline NetworkCórdoba → Sucre | Colombia | Operating | 85 km | 1.02 bcm/y | 1 | 2019 |
| Promigas Pipeline NetworkLa Guajira → Córdoba | Colombia | Operating | 2,537 km | 9.73 bcm/y | 1 | 1977 |
| Promigas Pipeline NetworkBolivar → Atlántico | Colombia | Operating | 135 km | 1.02 bcm/y | 1 | 2020 |
| Promigas Pipeline NetworkAtlántico → La Guajira | Colombia | Proposed | 1,691 km | 1.74 bcm/y | 1 | 2027 |
| Promigas Pipeline NetworkBolívar → Sucre | Colombia | Proposed | 1,691 km | Not reported | 1 | 2032 |
| Promigas Pipeline NetworkSucre → Córdoba | Colombia | Proposed | 1,691 km | Not reported | 1 | 2032 |
| Promigas Pipeline NetworkSucre → Sucre | Colombia | Proposed | 1,691 km | Not reported | 1 | 2033 |
| PromiorienteSantander → Santander | Colombia | Operating | 335 km | 0.61 bcm/y | 1 | — |
| TGI Pipeline NetworkSantander → La Guajira | Colombia | Operating | 771 km | 2.66 bcm/y | 1 | 1996 |
| TGI Pipeline NetworkSantander → Huila | Colombia | Operating | 1,120 km | 4.46 bcm/y | 1 | 1996 |
| TGI Pipeline NetworkTolima → Valle del Cauca | Colombia | Operating | 797 km | 1.72 bcm/y | 1 | 1997 |
| TGI Pipeline NetworkBoyacá → Santander | Colombia | Operating | 305 km | 0.65 bcm/y | 1 | 2000 |
| TGI Pipeline NetworkCasanare → Santander | Colombia | Operating | 406 km | 4.01 bcm/y | 1 | 2000 |
| TGI Pipeline NetworkCasanare → Casanare | Colombia | Operating | 13 km | 0.05 bcm/y | 1 | 1994 |
| TGI Pipeline NetworkCasanare → Cundinamarca | Colombia | Operating | 409 km | 0.31 bcm/y | 1 | 1995 |
| TGI Pipeline NetworkCundinamarca → Cundinamarca | Colombia | Operating | 150 km | 1.43 bcm/y | 1 | 2000 |
| TGI Pipeline NetworkBolívar → Santander | Colombia | Operating | 51 km | Not reported | 1 | 1997 |
| TGI Pipeline NetworkMeta → Meta | Colombia | Operating | 60 km | Not reported | 1 | 1997 |
| TGI Pipeline NetworkBoyacá → Tolima | Colombia | Proposed | 3,505 km | 1.96 bcm/y | 1 | 2030 |
| TGI Pipeline NetworkBoyacá → Santander | Colombia | Proposed | 3,505 km | 2.04 bcm/y | 1 | 2030 |
| TGI Pipeline NetworkLa Guajira → Santander | Colombia | Operating | 3,505 km | 1.23 bcm/y | 1 | — |
| TGI Pipeline NetworkTolima → Tolima | Colombia | Under construction | 3,505 km | 0.2 bcm/y | 1 | — |
| TGI Pipeline NetworkValle del Cauca → Tolima | Colombia | Proposed | 3,505 km | 2.56 bcm/y | 1 | 2029 |
| TGI Pipeline NetworkSantander → Casanare | Colombia | Proposed | 3,505 km | 1.23 bcm/y | 1 | 2030 |
| TGI Pipeline NetworkMeta → Meta | Colombia | Proposed | 3,505 km | 0.01 bcm/y | 1 | — |
| TGI Pipeline NetworkCasanare → Casanare | Colombia | Proposed | 28 km | 0.14 bcm/y | 1 | 2026 |
| TGI Pipeline NetworkHuila → Huila | Colombia | Proposed | 3,505 km | Not reported | 1 | 2026 |
| Trans-Caribbean Gas PipelineLa Guajira → Zulia | Venezuela, Colombia | Mothballed | 224 km | 5 bcm/y | 1 | 2007 |
| TransmetanoSantander → Antioquia | Colombia | Operating | 190 km | 0.8 bcm/y | 1 | — |
| TransoccidenteValle del Cauca → Valle del Cauca | Colombia | Operating | 11 km | 0.76 bcm/y | 1 | — |
| VIM - InteriorCórdoba → Boyacá | Colombia | Proposed | 300 km | 1.02 bcm/y | 1 | 2027 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.
Neighbouring countries
Countries that share a land border with this one and have tracked LNG infrastructure.
More countries in Americas
Ordered by number of tracked terminals, so countries next to each other here are of similar scale. The region is the one Global Energy Monitor gives this country's terminals.
In our rankings
Where this appears in the site's generated top lists. Each ranking page states its own method before its table.