Gas transmission pipeline · Sucre to Sucre
Promigas Pipeline Network
Promigas Pipeline Network is a proposed gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 1,691 km long by route geometry, starting up in 2033. It runs from Sucre to Sucre. It is owned by Promigas.
Length
1,691 km
Measured from the route geometry; GEM does not report a length.
Capacity
Not reported
Segments tracked
1
Route
Promigas Pipeline Network runs from Sucre to Sucre. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Sucre
- To
- Sucre
- Start country
- Colombia
- End country
- Colombia
- Countries crossed
- Colombia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 1,691 km
- GEM pipeline ID
- P7642
- Start year
- 2033
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| La Creciente-Sincelejo bidirectionality | Proposed | Sucre → Sucre | 1,691 | Not reported | — | 2033 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Coveñas FSRU | Colombia | Import | Proposed | 0.9 km | route proximity |
| El Viajano Altenesol LNG Terminal | Colombia | Import | Cancelled | 1 km | route proximity |
| Puerto Brisa LNG Terminal | Colombia | Import | Proposed | 3.3 km | route proximity |
| Colombia FLNG Terminal | Colombia | Export | Cancelled | 3.9 km | route proximity |
| Cartagena FSRU (Colombia) | Colombia | Import | Operating | 4.2 km | route proximity |
| Ciénaga FSRU | Colombia | Import | Proposed | 10.7 km | route proximity |
| Ballena FSRU | Colombia | Import | Proposed | 18 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Promigas100%
In the news
Recent headlines that name Promigas Pipeline Network. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Promigas Pipeline Network run?
- Promigas Pipeline Network runs from Sucre to Sucre, crossing Colombia.
- How long is Promigas Pipeline Network?
- Promigas Pipeline Network is 1,691 km long, measured from the mapped route because no length is reported.
- How much gas can Promigas Pipeline Network carry?
- No design capacity is reported for Promigas Pipeline Network. That is an absent figure, not a zero.
- Is Promigas Pipeline Network operating?
- Promigas Pipeline Network is proposed, with a reported start year of 2033.
- Who owns Promigas Pipeline Network?
- Promigas Pipeline Network is owned by Promigas, as recorded in the current tracker release.
- Does Promigas Pipeline Network serve an LNG terminal?
- Promigas Pipeline Network passes within 25 km of 7 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Colombia
Listed in name order among the 39 pipelines tracked in Colombia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- PromiorienteSantander to Santander · 335 km
- TGI Pipeline NetworkSantander to La Guajira · 771 km
- TGI Pipeline NetworkSantander to Huila · 1,120 km
- Promigas Pipeline NetworkAtlántico to La Guajira · 1,691 km
- Promigas Pipeline NetworkBolívar to Sucre · 1,691 km
- Promigas Pipeline NetworkSucre to Córdoba · 1,691 km