LNG Atlas

Gas transmission pipeline · Sucre to Sucre

Promigas Pipeline Network

Promigas Pipeline Network is a proposed gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 1,691 km long by route geometry, starting up in 2033. It runs from Sucre to Sucre. It is owned by Promigas.

Length

1,691 km

Measured from the route geometry; GEM does not report a length.

Capacity

Not reported

Segments tracked

1

Route

Promigas Pipeline Network runs from Sucre to Sucre. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Sucre
To
Sucre
Start country
Colombia
End country
Colombia
Countries crossed
Colombia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
1,691 km
GEM pipeline ID
P7642
Start year
2033
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
La Creciente-Sincelejo bidirectionalityProposedSucre → Sucre1,691Not reported—2033GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Coveñas FSRUColombiaImportProposed0.9 kmroute proximity
El Viajano Altenesol LNG TerminalColombiaImportCancelled1 kmroute proximity
Puerto Brisa LNG TerminalColombiaImportProposed3.3 kmroute proximity
Colombia FLNG TerminalColombiaExportCancelled3.9 kmroute proximity
Cartagena FSRU (Colombia)ColombiaImportOperating4.2 kmroute proximity
Ciénaga FSRUColombiaImportProposed10.7 kmroute proximity
Ballena FSRUColombiaImportProposed18 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Promigas Pipeline Network run?
Promigas Pipeline Network runs from Sucre to Sucre, crossing Colombia.
How long is Promigas Pipeline Network?
Promigas Pipeline Network is 1,691 km long, measured from the mapped route because no length is reported.
How much gas can Promigas Pipeline Network carry?
No design capacity is reported for Promigas Pipeline Network. That is an absent figure, not a zero.
Is Promigas Pipeline Network operating?
Promigas Pipeline Network is proposed, with a reported start year of 2033.
Who owns Promigas Pipeline Network?
Promigas Pipeline Network is owned by Promigas, as recorded in the current tracker release.
Does Promigas Pipeline Network serve an LNG terminal?
Promigas Pipeline Network passes within 25 km of 7 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Colombia

Listed in name order among the 39 pipelines tracked in Colombia, so projects with the same name sit together. A browse aid, not a claim that they are alike.