Country
Canada: LNG infrastructure
Canada has 36 LNG terminals and 75 tracked gas pipelines in the Global Energy Monitor tracker. It is a net exporter, with 21.8 Mtpa of operating liquefaction capacity and no operating import capacity.
Export capacity
21.8 Mtpa
5.4 Mtpa under construction
Import capacity
—
operating regasification
Pipelines
75
87,249 km tracked
Fleet
0
0 owned from here (flag not reported this release)
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 32 | 21.8 | 5.4 |
| Import (regasification) | 4 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Canada
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Atlantic Coast LNG TerminalNova Scotia | Export | Floating | Cancelled | Not reported | 1 | — |
| Aurora LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 2 | — |
| Bear Head LNG TerminalNova Scotia | Export | Not reported | Cancelled | Not reported | 1 | — |
| Cacouna LNG TerminalQuebec | Import | Not reported | Cancelled | Not reported | 1 | — |
| Cedar FLNG TerminalBritish Columbia | Export | FLNG | Under construction | 3.3 Mtpaunder construction | 1 | — |
| Discovery LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| Douglas Channel LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| Energie Saguenay LNG TerminalQuebec | Export | Not reported | Cancelled | Not reported | 1 | — |
| Fermeuse Energy FLNG Terminal | Export | FLNG | Proposed | Not reported | 1 | — |
| Goldboro LNG TerminalNova Scotia | Export | Not reported | Shelved | Not reported | 2 | — |
| Grassy Point LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 2 | — |
| Kitimat LNG Terminal | Export | Not reported | Cancelled | Not reported | 1 | — |
| Kitsault LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| Ksi Lisims FLNG TerminalBritish Columbia | Export | FLNG | Proposed | 12 Mtpaproposed | 1 | — |
| Kwispaa LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| LNG Canada TerminalBritish Columbia | Export | Not reported | Operating | 14 Mtpa | 2 | 2025 |
| Malahat LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| NewTimes Energy LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 3 | — |
| Nisga'a LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| Orca FLNG TerminalBritish Columbia | Export | FLNG | Cancelled | Not reported | 1 | — |
| Pacific NorthWest LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| Placentia Bay FLNG TerminalNewfoundland and Labrador | Export | FLNG | Shelved | Not reported | 1 | — |
| Port Edward LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| Prince Rupert LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| Rabaska LNG TerminalQuebec | Import | Not reported | Cancelled | Not reported | 1 | — |
| Saint John LNG TerminalNew Brunswick | Export | Not reported | Operating | 7.5 Mtpa | 3 | 2009 |
| Skeena LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| Steelhead FSRUBritish Columbia | Import | FSRU | Cancelled | Not reported | 1 | — |
| Stewart Energy LNG TerminalBritish Columbia | Export | Floating | Cancelled | Not reported | 2 | — |
| Stolt LNGaz TerminalQuebec | Export | Not reported | Cancelled | Not reported | 1 | — |
| Texada LNG TerminalBritish Columbia | Import | Not reported | Cancelled | Not reported | 1 | — |
| Tilbury Island LNG TerminalBritish Columbia | Export | Not reported | Operating | 0.28 Mtpa | 4 | 1971 |
| Triton LNG Export TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| WCC LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| Watson Island LNG TerminalBritish Columbia | Export | Not reported | Cancelled | Not reported | 1 | — |
| Woodfibre LNG TerminalBritish Columbia | Export | Not reported | Under construction | 2.1 Mtpaunder construction | 1 | — |
Gas pipelines crossing Canada
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Alaska Pipeline ProjectAlaska → Alberta | United States, Canada | Cancelled | 1,700 km | 46 bcm/y | 1 | — |
| Alliance Gas PipelineBritish Columbia → Illinois | Canada, United States | Operating | 3,848 km | 16.4 bcm/y | 1 | 2000 |
| Alliance Gas PipelineIllinois → Illinois | Canada, United States | Cancelled | 0 km | 4.09 bcm/y | 1 | 2021 |
| Alton Natural Gas PipelineNova Scotia → Nova Scotia | Canada | Operating | 11 km | Not reported | 1 | 2018 |
| Atlantic Bridge Gas PipelineMasschusetts → New Brunswick | United States, Canada | Operating | 10 km | 0.95 bcm/y | 1 | 2021 |
| BC Gas PipelineBritish Columbia → Washington | Canada, United States | Operating | 2,953 km | 34.8 bcm/y | 1 | 1957 |
| BC Gas PipelineBritish Columbia → British Columbia | Canada | Operating | 25 km | 3.68 bcm/y | 1 | 2022 |
| BC Gas PipelineBritish Columbia → British Columbia | Canada | Operating | 13 km | 0.61 bcm/y | 1 | 2021 |
| BC Gas PipelineBritish Columbia → British Columbia | Canada | Operating | 36 km | 1.41 bcm/y | 1 | 2017 |
| BC Gas PipelineBritish Columbia → British Columbia | Canada | Operating | 27 km | 0.51 bcm/y | 1 | 2018 |
| BC Gas PipelineBritish Columbia → British Columbia | Canada | Operating | 0 km | 1.94 bcm/y | 1 | 2021 |
| BC Gas PipelineBritish Columbia → British Columbia | Canada | Operating | 39 km | 2.45 bcm/y | 1 | 2018 |
| BC Gas Pipeline | Canada | Proposed | 18 km | 5.47 bcm/y | 1 | 2026 |
| BC Gas Pipeline | Canada | Proposed | 32 km | 1.82 bcm/y | 1 | 2028 |
| Bear Paw Gas PipelineNova Scotia → Nova Scotia | Canada | Cancelled | 63 km | Not reported | 1 | — |
| Canadian Mainline Gas PipelineAlberta-Saskatchewan boundary → Ontario | Canada | Operating | 14,082 km | 71.2 bcm/y | 1 | 1955 |
| Cedar LNG PipelineBritish Columbia → British Columbia | Canada | Under construction | 8 km | 4.09 bcm/y | 1 | 2028 |
| Centra PipelineManitoba → Ontario | Canada, United States | Operating | 270 km | 0.66 bcm/y | 1 | — |
| Coastal GasLink PipelineBritish Columbia → British Columbia | Canada | Operating | 670 km | 21.5 bcm/y | 1 | 2024 |
| Coastal GasLink PipelineBritish Columbia → British Columbia | Canada | Proposed | 0 km | 21.5 bcm/y | 1 | — |
| Denali Alaskan Natural Gas PipelineAlaska → Alberta | United States, Canada | Cancelled | 1,126 km | 46 bcm/y | 1 | 2020 |
| Emera Brunswick Gas PipelineNew Brunswick → New Brunswick | Canada | Operating | 145 km | 8.38 bcm/y | 1 | 2009 |
| Empire PipelineOntario → Pennsylvania | Canada, United States | Operating | 433 km | 3.07 bcm/y | 1 | 1993 |
| Empire PipelinePennsylvania → Ontario | United States, Canada | Operating | 40 km | 3.07 bcm/y | 1 | 2020 |
| Energíe Saguenay Gas PipelineOntario → Quebec | Canada | Cancelled | 782 km | Not reported | 1 | — |
| Foothills System Gas PipelineAlberta → Saskatchewan | Canada | Operating | 1,237 km | 33.7 bcm/y | 1 | 1981 |
| FortisBC PipelineBritish Columbia → British Columbia | Canada | Under construction | 47 km | 2.33 bcm/y | 1 | 2027 |
| FortisBC PipelineBritish Columbia → British Columbia | Canada | Operating | 2,075 km | Not reported | 1 | — |
| Gas Transmission NorthwestBritish Columbia → Oregon | Canada, United States | Operating | 2,177 km | 29.6 bcm/y | 1 | 1961 |
| Great Lakes Gas Transmission Pipeline | Canada, United States | Operating | 3,404 km | 24.5 bcm/y | 1 | 1967 |
| Mackenzie Gas Pipeline ProjectNorthwest Territories → Alberta | Canada | Cancelled | 1,220 km | 12.3 bcm/y | 1 | — |
| Many Islands Pipelines | Canada | Operating | 476 km | Not reported | 1 | 1966 |
| Maritimes and Northeast Gas PipelineNova Scotia → Massachusetts | Canada, United States | Operating | 1,432 km | 8.48 bcm/y | 1 | 1999 |
| Merrick Mainline PipelineBritish Columbia → British Columbia | Canada | Cancelled | 260 km | 20.4 bcm/y | 1 | 2020 |
| Minell PipelineSaskatchewan → Manitoba | Canada | Operating | 70 km | Not reported | 1 | 1965 |
| North Montney Mainline PipelineBritish Columbia → British Columbia | Canada | Operating | 206 km | 17.4 bcm/y | 1 | 2020 |
| North Wapiti Pipeline SystemAlberta → Alberta | Canada | Operating | 34 km | 1.53 bcm/y | 1 | 2019 |
| Northern Border Gas PipelineMontana → Indiana | Canada, United States | Operating | 2,272 km | 24.5 bcm/y | 1 | 1982 |
| Nova Gas Transmission (NGTL) PipelineBritish Columbia → British Columbia | Canada | Cancelled | 100 km | 10.2 bcm/y | 1 | — |
| Nova Gas Transmission (NGTL) PipelineSaskatchewan → British Columbia | Canada | Operating | 24,500 km | 81.8 bcm/y | 1 | 1957 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 29 km | 3.63 bcm/y | 1 | 2022 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 344 km | 14.8 bcm/y | 1 | 2023 |
| Nova Gas Transmission (NGTL) PipelineAlberta → British Columbia | Canada | Cancelled | 89 km | 27.6 bcm/y | 1 | 2021 |
| Nova Gas Transmission (NGTL) PipelineAlberta → British Columbia | Canada | Cancelled | 275 km | 30.7 bcm/y | 1 | — |
| Nova Gas Transmission (NGTL) PipelineAlberta → British Columbia | Canada | Operating | 230 km | Not reported | 1 | 2018 |
| Nova Gas Transmission (NGTL) PipelineAlberta → British Columbia | Canada | Operating | 85 km | Not reported | 1 | 2022 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 36 km | Not reported | 1 | 2022 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 39 km | 1.76 bcm/y | 1 | 2023 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 13 km | Not reported | 1 | 2022 |
| Nova Gas Transmission (NGTL) PipelineBritish Columbia → British Columbia | Canada | Operating | 31 km | 1.63 bcm/y | 1 | 2023 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Cancelled | 65 km | Not reported | 1 | — |
| Nova Gas Transmission (NGTL) PipelineBritish Columbia → British Columbia | Canada | Operating | 23 km | 3.36 bcm/y | 1 | 2023 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 23 km | Not reported | 1 | 2020 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 20 km | Not reported | 1 | 2022 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 21 km | Not reported | 1 | 2018 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 22 km | Not reported | 1 | 2020 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 87 km | Not reported | 1 | 2017 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 24 km | Not reported | 1 | 2023 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 32 km | Not reported | 1 | 2023 |
| Nova Gas Transmission (NGTL) PipelineAlberta → Alberta | Canada | Operating | 36 km | Not reported | 1 | 2023 |
| Nova Gas Transmission (NGTL) Pipeline | Canada | Proposed | 22 km | Not reported | 1 | 2027 |
| Pacific Trail Gas PipelinesBritish Columbia → British Columbia | Canada | Shelved | 471 km | 13.9 bcm/y | 1 | — |
| Pioneer Gas PipelineAlberta → Alberta | Canada | Operating | 131 km | 1.33 bcm/y | 1 | 2019 |
| Pioneer Gas PipelineAlberta → Alberta | Canada | Under construction | 120 km | 3.17 bcm/y | 1 | 2019 |
| Portland Natural Gas Transmission System (PNGTS)New Hampshire → Quebec | United States, Canada | Operating | 0 km | 0.25 bcm/y | 1 | 2020 |
| Portland Natural Gas Transmission System (PNGTS)New Hampshire → Quebec | United States, Canada | Operating | 0 km | 0.64 bcm/y | 1 | 2021 |
| Prince Rupert Gas Transmission PipelineBritish Columbia → British Columbia | Canada | Under construction | 750 km | 20.4 bcm/y | 1 | 2029 |
| Tioga to Emerson PipelineNorth Dakota → Manitoba | United States, Canada | Shelved | 531 km | 6.13 bcm/y | 1 | 2025 |
| Trans Québec and Maritimes (TQM) PipelineQuebec → Quebec | Canada | Operating | 572 km | 8.18 bcm/y | 1 | 1982 |
| TransGas PipelineSaskatchewan → Saskatchewan | Canada | Operating | 14,676 km | Not reported | 1 | 1988 |
| Transgas Pipeline | Canada | Proposed | 80 km | Not reported | 1 | 2026 |
| Transgas Pipeline | Canada | Proposed | 42 km | Not reported | 1 | — |
| Vector Gas PipelineIllinois → Ontario | United States, Canada | Operating | 560 km | 17.8 bcm/y | 1 | 2000 |
| Viking Gas TransmissionManitoba → Wisconsin | Canada, United States | Operating | 1,080 km | 5.11 bcm/y | 1 | 1996 |
| Westcoast Connector Gas Transmission ProjectBritish Columbia → British Columbia | Canada | Cancelled | 850 km | 42.9 bcm/y | 1 | 2019 |
Companies headquartered in Canada
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.
Neighbouring countries
Countries that share a land border with this one and have tracked LNG infrastructure.
More countries in Americas
Ordered by number of tracked terminals, so countries next to each other here are of similar scale. The region is the one Global Energy Monitor gives this country's terminals.
In our rankings
Where this appears in the site's generated top lists. Each ranking page states its own method before its table.