Import terminal · Valle del Cauca, Colombia
Andes Energy LNG Terminal
Andes Energy LNG Terminal is a proposed LNG import terminal in Valle del Cauca, Colombia. The tracker lists 1 tracked unit; capacity is not reported. It is owned by Andes Energy Terminal SAS.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
Not reported
1 unit, capacity not reported
At a glance
- Country
- Colombia
- State / province
- Valle del Cauca
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Proposed
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 3.9040° N, 77.0848° W
- GEM terminal ID
- T100000130960
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Proposed | Not reported | Not reported | — | — | Not reported | Andes Energy Terminal SAS [100%] |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Location
Andes Energy LNG Terminal at 3.9040° N, 77.0848° W, with 7 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 3.9040° N, 77.0848° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Buenaventura-Yumbo Gas Pipeline | Proposed | 100 km | 4.09 bcm/y | 1 km | route proximity |
| Blue Energy Bowen Gas Pipeline | Proposed | 500 km | 3.01 bcm/y | — | name match |
| Kinetica Energy Express | Operating | 1,139 km | — | — | name match |
| Louisiana Energy Access Project Pipeline | Operating | 241 km | 10.22 bcm/y | — | name match |
| Louisiana Energy Gateway | Under construction | 209 km | 18.4 bcm/y | — | name match |
| Victoria Energy Terminal Gas Pipeline | Proposed | 19 km | — | — | name match |
| Western Energy Storage and Transportation Header Project | Cancelled | 1,046 km | 20.44 bcm/y | — | name match |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Panama Canal
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Andes Energy LNG Terminal?
- Andes Energy LNG Terminal is an LNG import terminal in Valle del Cauca, Colombia. It is made up of 1 tracked train or phase.
- Is Andes Energy LNG Terminal operating?
- Andes Energy LNG Terminal is proposed. Nothing here should be read as a forecast that it will be built.
- How much LNG can Andes Energy LNG Terminal handle?
- Global Energy Monitor reports no capacity for Andes Energy LNG Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Andes Energy LNG Terminal?
- Andes Energy LNG Terminal is owned by Andes Energy Terminal SAS. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Andes Energy LNG Terminal pass?
- Cargoes from Andes Energy LNG Terminal would normally pass Panama Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Andes Energy LNG Terminal?
- 7 tracked gas pipelines pass within 25 km of Andes Energy LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.