Gas transmission pipeline · Córdoba to Antioquia
Northwestern Gas Pipeline
Northwestern Gas Pipeline is a cancelled gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 289 km long and 1.02 bcm/y of capacity, starting up in 2023. It runs from Córdoba to Antioquia. It is owned by Canacol Energy.
Length
289 km
Capacity
1.02 bcm/y
0.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 559 mm (22 in)
Route
Northwestern Gas Pipeline runs from Córdoba to Antioquia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Córdoba
- To
- Antioquia
- Start country
- Colombia
- End country
- Colombia
- Countries crossed
- Colombia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 267 km
- GEM pipeline ID
- P2185
- Start year
- 2023
- Cancelled (year GEM records)
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase 1 | Cancelled | Córdoba → Antioquia | 289 | 1.02 | 559 mm | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Canacol Energy100%
Parent companies
- Canacol Energy100%
In the news
Recent headlines that name Northwestern Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Northwestern Gas Pipeline run?
- Northwestern Gas Pipeline runs from Córdoba to Antioquia, crossing Colombia.
- How long is Northwestern Gas Pipeline?
- Northwestern Gas Pipeline is 289 km long.
- How much gas can Northwestern Gas Pipeline carry?
- Northwestern Gas Pipeline has a design capacity of 1.02 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Northwestern Gas Pipeline operating?
- Northwestern Gas Pipeline is cancelled, with a reported start year of 2023.
- Who owns Northwestern Gas Pipeline?
- Northwestern Gas Pipeline is owned by Canacol Energy, as recorded in the current tracker release.
More gas pipelines in Colombia
Listed in name order among the 39 pipelines tracked in Colombia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Northwestern Gas PipelineAntioquia to Tolima · 139 km
- Northwestern Gas PipelineTolima to Cundinamarca · 105 km
- ProgasurValle del Cauca to Cauca
- Bogotá - SNT Magdalena MedioCundinamarca to Tolima · 105 km
- Buenaventura-Yumbo Gas PipelineValle del Cauca to Valle del Cauca · 100 km