LNG Chain

Gas transmission pipeline · Bogotá to Mariquita

Bogotá - SNT Magdalena Medio

Bogotá - SNT Magdalena Medio is a proposed gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 105 km long and 2.2 bcm/y of capacity, starting up in 2030. It runs from Bogotá to Mariquita.

Length

105 km

Capacity

2.2 bcm/y

1.6 Mtpa LNG equivalent

Segments tracked

1

Route

Bogotá - SNT Magdalena Medio runs from Bogotá to Mariquita. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bogotá
To
Mariquita
Start country
Colombia
End country
Colombia
Countries crossed
Colombia
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
105 km
GEM pipeline ID
P7570
Start year
2030
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Mariquita-VasconiaProposedBogotá → Mariquita1052.22030GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Bogotá - SNT Magdalena Medio run?
Bogotá - SNT Magdalena Medio runs from Bogotá to Mariquita, crossing Colombia.
How long is Bogotá - SNT Magdalena Medio?
Bogotá - SNT Magdalena Medio is 105 km long.
How much gas can Bogotá - SNT Magdalena Medio carry?
Bogotá - SNT Magdalena Medio has a design capacity of 2.2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Bogotá - SNT Magdalena Medio operating?
Bogotá - SNT Magdalena Medio is proposed, with a reported start year of 2030.
Who owns Bogotá - SNT Magdalena Medio?
Ownership of Bogotá - SNT Magdalena Medio is not reported in the current tracker release.