Gas transmission pipeline · Cúcuta to San Alberto
Cúcuta - SNT Magdalena Medio
Cúcuta - SNT Magdalena Medio is a proposed gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 100 km long and 0.08 bcm/y of capacity, starting up in 2030. It runs from Cúcuta to San Alberto.
Length
100 km
Capacity
0.08 bcm/y
0.1 Mtpa LNG equivalent
Segments tracked
1
Route
Cúcuta - SNT Magdalena Medio runs from Cúcuta to San Alberto. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Cúcuta
- To
- San Alberto
- Start country
- Colombia
- End country
- Colombia
- Countries crossed
- Colombia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 100 km
- GEM pipeline ID
- P7571
- Start year
- 2030
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Cúcuta - San Alberto | Proposed | Cúcuta → San Alberto | 100 | 0.08 | — | 2030 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Cúcuta - SNT Magdalena Medio run?
- Cúcuta - SNT Magdalena Medio runs from Cúcuta to San Alberto, crossing Colombia.
- How long is Cúcuta - SNT Magdalena Medio?
- Cúcuta - SNT Magdalena Medio is 100 km long.
- How much gas can Cúcuta - SNT Magdalena Medio carry?
- Cúcuta - SNT Magdalena Medio has a design capacity of 0.08 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Cúcuta - SNT Magdalena Medio operating?
- Cúcuta - SNT Magdalena Medio is proposed, with a reported start year of 2030.
- Who owns Cúcuta - SNT Magdalena Medio?
- Ownership of Cúcuta - SNT Magdalena Medio is not reported in the current tracker release.