Export terminal · Newfoundland and Labrador, Canada
Placentia Bay FLNG Terminal
Placentia Bay FLNG Terminal is a shelved LNG export terminal (floating liquefaction (FLNG) facility) in Newfoundland and Labrador, Canada. The tracker lists 1 tracked unit; capacity is not reported. It is owned by LNG Newfoundland and Labrador Ltd.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
- Country
- Canada
- State / province
- Newfoundland and Labrador
- Region
- Americas
- Import / export
- Export
- Onshore / floating
- FLNG
- Status (rolled up)
- Shelved
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 47.4172° N, 53.8757° W
- GEM terminal ID
- T100000131042
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Shelved | 4 | 5.44 | — | 2021 | Pre-FID | LNG Newfoundland and Labrador Ltd |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Shelved | 1 | 4 | 5.44 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Parent companies
Reported cost
Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.
| Unit | Status | Capacity | Estimated cost | Per tonne a year |
|---|---|---|---|---|
| Not reported | Shelved | 4 Mtpa | $10 billion | $2,500 |
A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.
Location
Placentia Bay FLNG Terminal at 47.4172° N, 53.8757° W.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 47.4172° N, 53.8757° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
No tracked gas pipeline passes within 25 km of this terminal in the current release.
In the news
Recent headlines that name Placentia Bay FLNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Placentia Bay FLNG Terminal?
- Placentia Bay FLNG Terminal is an LNG export terminal in Newfoundland and Labrador, Canada. It is made up of 1 tracked train or phase.
- Is Placentia Bay FLNG Terminal operating?
- Placentia Bay FLNG Terminal is shelved. Nothing here should be read as a forecast that it will be built.
- How much LNG can Placentia Bay FLNG Terminal handle?
- Global Energy Monitor reports no capacity for Placentia Bay FLNG Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Placentia Bay FLNG Terminal?
- Placentia Bay FLNG Terminal is owned by LNG Newfoundland and Labrador Ltd. Shares are as recorded in the current tracker release.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.