LNG Chain

Gas transmission pipeline · Dawson Creek to Kitimat

Coastal GasLink Pipeline

Coastal GasLink Pipeline is an operating gas transmission pipeline in Canada. The tracker lists 1 tracked segment, 670 km long and 21.46 bcm/y of capacity, starting up in 2024. It runs from Dawson Creek to Kitimat. It is owned by Alberta Investment Management Co, TC Energy Corp and KKR Global Infrastructure Investors III.

Length

670 km

Capacity

21.5 bcm/y

15.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1219 mm (48 in)

Route

From
Dawson Creek
To
Kitimat
Start country
Canada
End country
Canada
Countries crossed
Canada
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
635 km
GEM pipeline ID
P0167
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingDawson Creek → Kitimat67021.51219 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
LNG Canada TerminalCanadaExportOperating0.5 kmroute proximity
Cedar FLNG TerminalCanadaExportUnder construction5.8 kmroute proximity
Douglas Channel LNG TerminalCanadaExportCancelled5.8 kmroute proximity
Triton LNG Export TerminalCanadaExportCancelled5.8 kmroute proximity
Kitimat LNG TerminalCanadaExportCancelled12.2 kmroute proximity
Coastal Bend LNG TerminalUnited StatesExportProposedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Coastal GasLink Pipeline run?
Coastal GasLink Pipeline runs from Dawson Creek to Kitimat, crossing Canada.
How long is Coastal GasLink Pipeline?
Coastal GasLink Pipeline is 670 km long.
How much gas can Coastal GasLink Pipeline carry?
Coastal GasLink Pipeline has a design capacity of 21.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Coastal GasLink Pipeline operating?
Coastal GasLink Pipeline is operating, having started in 2024.
Who owns Coastal GasLink Pipeline?
Coastal GasLink Pipeline is owned by TC Energy Corp, Alberta Investment Management Co and KKR Global Infrastructure Investors III, as recorded in the current tracker release.
Does Coastal GasLink Pipeline serve an LNG terminal?
Coastal GasLink Pipeline passes within 25 km of 6 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.