Gas transmission pipeline · Quebec City to East Hereford
Trans Québec and Maritimes (TQM) Pipeline
Trans Québec and Maritimes (TQM) Pipeline is an operating gas transmission pipeline in Canada. The tracker lists 1 tracked segment, 572 km long and 8.18 bcm/y of capacity, starting up in 1982. It runs from Quebec City to East Hereford. It is owned by TC Energy Corp and Trencap.
Length
572 km
Capacity
8.18 bcm/y
6.0 Mtpa LNG equivalent
Segments tracked
1
Route
Trans Québec and Maritimes (TQM) Pipeline runs from Quebec City to East Hereford. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Quebec City
- To
- East Hereford
- Start country
- Canada
- End country
- Canada
- Countries crossed
- Canada
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 489 km
- GEM pipeline ID
- P0267
- Start year
- 1982
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Quebec City → East Hereford | 572 | 8.18 | — | 1982 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Stolt LNGaz Terminal | Canada | Export | Cancelled | 2.6 km | route proximity |
| Rabaska LNG Terminal | Canada | Import | Cancelled | 12.2 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- TC Energy Corp50%
- Trencap50%
Parent companies
- TC Energy Corp50%
- Province of Quebec40.45%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Trans Québec and Maritimes (TQM) Pipeline run?
- Trans Québec and Maritimes (TQM) Pipeline runs from Quebec City to East Hereford, crossing Canada.
- How long is Trans Québec and Maritimes (TQM) Pipeline?
- Trans Québec and Maritimes (TQM) Pipeline is 572 km long.
- How much gas can Trans Québec and Maritimes (TQM) Pipeline carry?
- Trans Québec and Maritimes (TQM) Pipeline has a design capacity of 8.18 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Trans Québec and Maritimes (TQM) Pipeline operating?
- Trans Québec and Maritimes (TQM) Pipeline is operating, having started in 1982.
- Who owns Trans Québec and Maritimes (TQM) Pipeline?
- Trans Québec and Maritimes (TQM) Pipeline is owned by TC Energy Corp and Trencap, as recorded in the current tracker release.
- Does Trans Québec and Maritimes (TQM) Pipeline serve an LNG terminal?
- Trans Québec and Maritimes (TQM) Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.