Import terminal · Quebec, Canada
Rabaska LNG Terminal
Rabaska LNG Terminal is a cancelled LNG import terminal in Quebec, Canada. The tracker lists 1 tracked unit; capacity is not reported. Owners include Gazprom PJSC, ENGIE SA, Enbridge Inc and 1 other.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Cancelled | 3.8 | 5.17 | — | — | Not reported | Gazprom PJSC; ENGIE SA; Enbridge Inc; Énergir Inc |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 3.8 | 5.17 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Parent companies
Reported cost
Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.
| Unit | Status | Capacity | Estimated cost | Per tonne a year |
|---|---|---|---|---|
| Not reported | Cancelled | 3.8 Mtpa | $672 million840,000,000 CAN as reported | $177 |
A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.
Location
Rabaska LNG Terminal at 46.8000° N, 71.1833° W, with 1 tracked gas pipeline passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 46.8000° N, 71.1833° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Trans Québec and Maritimes (TQM) Pipeline | Operating | 572 km | 8.18 bcm/y | 2.8 km | route proximity |
Vessels owned by the same companies
Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.
| Vessel | Via | Status | Capacity | Delivered |
|---|---|---|---|---|
| Marshal Vasilevskiy | Gazprom PJSC | Operating | 174,000 m³ | 2018 |
| Portovyy | Gazprom PJSC | Operating | 138,100 m³ | 2003 |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Rabaska LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Rabaska LNG Terminal?
- Rabaska LNG Terminal is an LNG import terminal in Quebec, Canada. It is made up of 1 tracked train or phase.
- Is Rabaska LNG Terminal operating?
- Rabaska LNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
- How much LNG can Rabaska LNG Terminal handle?
- Global Energy Monitor reports no capacity for Rabaska LNG Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Rabaska LNG Terminal?
- Rabaska LNG Terminal is owned by Enbridge Inc, Énergir Inc, ENGIE SA and 1 other. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Rabaska LNG Terminal pass?
- Cargoes from Rabaska LNG Terminal would normally pass Panama Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Rabaska LNG Terminal?
- 1 tracked gas pipeline passes within 25 km of Rabaska LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.