Export terminal · Louisiana, United States
Plaquemines LNG Terminal
Plaquemines LNG Terminal is an operating LNG export terminal in Louisiana, United States. The tracker lists 3 tracked units with 10 Mtpa operating, 10 Mtpa under construction, 24.8 Mtpa proposed, the earliest starting in 2025. It is owned by Venture Global Plaquemines LNG LLC.
Operating
10 Mtpa
13.6 bcm/y · 1 unit
Under construction
10 Mtpa
13.6 bcm/y · 1 unit
Proposed
24.8 Mtpa
33.7 bcm/y · 1 unit
At a glance
- Country
- United States
- State / province
- Louisiana
- Region
- Americas
- Import / export
- Export
- Onshore / floating
- Not reported
- Status (rolled up)
- Operating
- Trains / phases tracked
- 3
- Earliest start year
- 2025
- Latest start year
- 2025
- Coordinates
- 29.6004° N, 89.8864° W
- GEM terminal ID
- T100000130242
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Phase 1 (T1–18) | Operating | 10 | 13.6 | 2025 | — | FID | Venture Global Plaquemines LNG LLC [100%] |
| Expansion (T37-60) | Proposed | 24.8 | 33.7 | — | 2025 | Not reported | Venture Global Plaquemines LNG LLC [100%] |
| Phase 2 (T19–36) | Under construction | 10 | 13.6 | — | — | FID | Venture Global Plaquemines LNG LLC [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 1 | 10 | 13.6 |
| Under construction | 1 | 10 | 13.6 |
| Proposed | 1 | 24.8 | 33.7 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Parent companies
Operators
Reported cost
Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.
| Unit | Status | Capacity | Estimated cost | Per tonne a year |
|---|---|---|---|---|
| Phase 1 (T1–18) | Operating | 10 Mtpa | $15.8 billion | $1,575 |
| Expansion (T37-60) | Proposed | 24.8 Mtpa | $18 billion | $726 |
| Phase 2 (T19–36) | Under construction | 10 Mtpa | $7.8 billion | $780 |
Financing as GEM records it: Initial US$500 million loan from Bank of America, JPMorgan Chase, Mizuho and Morgan Stanley (Phases 1 and 2)
A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.
Power, vessels and projects tied to this terminal
Low-carbon projects recorded
- Carbon capture and storage
A project is recorded against the terminal; that does not mean it is built or running. See all terminals with low-carbon projects recorded.
Location
Plaquemines LNG Terminal at 29.6004° N, 89.8864° W, with 32 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 29.6004° N, 89.8864° W
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Gator Express Gas Pipeline | Under construction | 24 km | 20.13 bcm/y | 2.2 km | route proximity |
| Gator Express Gas Pipeline | Operating | 19 km | 20.13 bcm/y | 2.2 km | route proximity |
| Gator Express Gas Pipeline | Operating | 0 km | 2.45 bcm/y | 2.2 km | route proximity |
| Delta Express Gas Pipeline | Shelved | 452 km | — | 4.4 km | route proximity |
| Gulf South Gas Pipeline | Operating | 12,070 km | 27.59 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Operating | 0 km | 0.49 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Operating | 6 km | 2.04 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Operating | 29 km | 10.22 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Operating | 26 km | 7.51 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Operating | 0 km | 5.68 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Operating | 113 km | 5.22 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Operating | 0 km | 2.56 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Operating | 47 km | 2.41 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Operating | 0 km | 2.04 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Proposed | 3 km | 2.41 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Proposed | 0 km | 1.23 bcm/y | 7.6 km | route proximity |
| Gulf South Gas Pipeline | Proposed | 0 km | 2.86 bcm/y | 7.6 km | route proximity |
| Evangeline Pass Gas Pipeline | Operating | 21 km | 11.24 bcm/y | 17 km | route proximity |
| Tennessee Gas Pipeline | Operating | 18,926 km | 10.22 bcm/y | 17 km | route proximity |
| Tennessee Gas Pipeline | Operating | 0 km | 9.14 bcm/y | 17 km | route proximity |
| Tennessee Gas Pipeline | Cancelled | 1,551 km | — | 17 km | route proximity |
| Tennessee Gas Pipeline | Cancelled | 547 km | 13.29 bcm/y | 17 km | route proximity |
| Kinetica Energy Express | Operating | 1,139 km | — | 18.2 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Operating | 14,202 km | 119.47 bcm/y | 18.5 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Proposed | 5 km | 12.88 bcm/y | 18.5 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Operating | 2 km | 0.18 bcm/y | 18.5 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Proposed | 0 km | 0.33 bcm/y | 18.5 km | route proximity |
| Columbia Gas Transmission | Operating | 0 km | 0.46 bcm/y | 18.6 km | route proximity |
| Columbia Gas Transmission | Under construction | 0 km | 5.04 bcm/y | 18.6 km | route proximity |
| Columbia Gas Transmission | Operating | 13 km | 1.87 bcm/y | 18.6 km | route proximity |
| Columbia Gas Transmission | Proposed | 0 km | 3.58 bcm/y | 18.6 km | route proximity |
| Columbia Gas Transmission | Proposed | 1 km | — | 18.6 km | route proximity |
Vessels owned by the same companies
Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.
| Vessel | Via | Status | Capacity | Delivered |
|---|---|---|---|---|
| Hull 2541 (Hanwha) | Venture Global LNG | Under construction | 200,000 m³ | 2026 |
| Hull 2542 (Hanwha) | Venture Global LNG | Under construction | 200,000 m³ | 2026 |
| Hull 2543 (Hanwha) | Venture Global LNG | Under construction | 200,000 m³ | 2026 |
| Hull 2574 (Hanwha) | Venture Global LNG | Under construction | 200,000 m³ | 2026 |
| Hull 2575 (Hanwha) | Venture Global LNG | Under construction | 200,000 m³ | 2026 |
| Venture Bayou | Venture Global LNG | Operating | 174,000 m³ | 2024 |
| Venture Gator | Venture Global LNG | Operating | 174,000 m³ | 2024 |
Exposed to chokepoints
Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.
| Destination | Chokepoints on the usual route | Alternative route |
|---|---|---|
| East Asia | Panama CanalPanama slot availability and draught decide between these; the Cape is the fallback. | Suez CanalStrait of Malacca |
| South Asia | Suez CanalBab el-Mandeb | Cape of Good Hope |
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Plaquemines LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Plaquemines LNG Terminal?
- Plaquemines LNG Terminal is an LNG export terminal in Louisiana, United States. It is made up of 3 tracked trains and phases.
- Is Plaquemines LNG Terminal operating?
- Plaquemines LNG Terminal is operating, with its first tracked train starting in 2025.
- How much LNG can Plaquemines LNG Terminal handle?
- Plaquemines LNG Terminal has 10 Mtpa operating, 10 Mtpa under construction, 24.8 Mtpa proposed, equivalent to 13.6 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns Plaquemines LNG Terminal?
- Plaquemines LNG Terminal is owned by Venture Global Plaquemines LNG LLC, and operated by Venture Global LNG. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Plaquemines LNG Terminal pass?
- Cargoes from Plaquemines LNG Terminal would normally pass Panama Canal, Suez Canal, Bab el-Mandeb, Strait of Malacca and 1 other. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Plaquemines LNG Terminal?
- 32 tracked gas pipelines pass within 25 km of Plaquemines LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
In our rankings
Where this appears in the site's generated top lists. Each ranking page states its own method before its table.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.