Export terminal · Louisiana, United States
Lake Charles LNG Terminal
Lake Charles LNG Terminal is a proposed LNG export terminal in Louisiana, United States. The tracker lists 2 tracked units with 17.8 Mtpa proposed, the earliest starting in 1982. It is owned by Lake Charles LNG Company LLC and Lake Charles LNG Export Company LLC.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
17.8 Mtpa
24.2 bcm/y · 1 unit
At a glance
- Country
- United States
- State / province
- Louisiana
- Region
- Americas
- Import / export
- Export
- Onshore / floating
- Not reported
- Status (rolled up)
- Proposed
- Trains / phases tracked
- 2
- Earliest start year
- 1982
- Latest start year
- 1982
- Coordinates
- 30.1204° N, 93.2878° W
- GEM terminal ID
- T100000130232
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Import Terminal | Mothballed | 17.9 | 24.4 | 1982 | — | Not reported | Lake Charles LNG Company LLC [100%] |
| Export Terminal (T1-T3) | Proposed | 17.8 | 24.2 | — | — | Pre-FID | Lake Charles LNG Company LLC; Lake Charles LNG Export Company LLC |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Proposed | 1 | 17.8 | 24.2 |
| Mothballed | 1 | 17.9 | 24.3 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Parent companies
Operators
Reported cost
Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.
| Unit | Status | Capacity | Estimated cost | Per tonne a year |
|---|---|---|---|---|
| Export Terminal (T1-T3) | Proposed | 17.8 Mtpa | $13.2 billion | $742 |
A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.
Location
Lake Charles LNG Terminal at 30.1204° N, 93.2878° W, with 70 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 30.1204° N, 93.2878° W
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Gulf South Gas Pipeline | Operating | 12,070 km | 27.59 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Operating | 0 km | 0.49 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Operating | 6 km | 2.04 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Operating | 29 km | 10.22 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Operating | 26 km | 7.51 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Operating | 0 km | 5.68 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Operating | 113 km | 5.22 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Operating | 0 km | 2.56 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Operating | 47 km | 2.41 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Operating | 0 km | 2.04 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Proposed | 3 km | 2.41 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Proposed | 0 km | 1.23 bcm/y | 0.5 km | route proximity |
| Gulf South Gas Pipeline | Proposed | 0 km | 2.86 bcm/y | 0.5 km | route proximity |
| Trunkline Gas Pipeline | Operating | 3,932 km | 15.33 bcm/y | 0.5 km | route proximity |
| Driftwood LNG Pipeline | Under construction | 59 km | 24.53 bcm/y | 4.6 km | route proximity |
| Driftwood LNG Pipeline | Proposed | 0 km | 10.22 bcm/y | 4.6 km | route proximity |
| Driftwood LNG Pipeline | Proposed | 52 km | 47.01 bcm/y | 4.6 km | route proximity |
| Driftwood LNG Pipeline | Proposed | 160 km | 40.88 bcm/y | 4.8 km | route proximity |
| Columbia Gulf Transmission Pipeline | Operating | 5,360 km | — | 5.9 km | route proximity |
| CP Express Pipeline | Under construction | 147 km | 40.88 bcm/y | 6.1 km | route proximity |
| Creole Trail Pipeline | Operating | 151 km | 15.33 bcm/y | 6.3 km | route proximity |
| Creole Trail Pipeline | Proposed | 0 km | 9.5 bcm/y | 6.3 km | route proximity |
| Gulf Coast Southbound Pipeline | Under construction | 0 km | 2.66 bcm/y | 9.4 km | route proximity |
| Gulf Coast Southbound Pipeline | Operating | 2,227 km | 4.7 bcm/y | 9.4 km | route proximity |
| Gulf Coast Southbound Pipeline | Operating | 2 km | 0.72 bcm/y | 9.4 km | route proximity |
| Gulf Coast Southbound Pipeline | Operating | 0 km | 3.07 bcm/y | 9.4 km | route proximity |
| ANR Gas Pipeline | Operating | 2,897 km | 61.32 bcm/y | 9.8 km | route proximity |
| ANR Gas Pipeline | Operating | 0 km | 1.69 bcm/y | 9.8 km | route proximity |
| ANR Gas Pipeline | Proposed | 0 km | 1.28 bcm/y | 9.8 km | route proximity |
| ANR Gas Pipeline | Under construction | 0 km | 4.29 bcm/y | 9.8 km | route proximity |
| ANR Gas Pipeline | Proposed | 0 km | 0.74 bcm/y | 9.8 km | route proximity |
| ANR Gas Pipeline | Proposed | 1 km | 0 bcm/y | 9.8 km | route proximity |
| Sabine Natural Gas Pipeline System | Operating | 211 km | 2.4 bcm/y | 10.5 km | route proximity |
| Port Arthur Gas Pipeline | Proposed | 116 km | 20.44 bcm/y | 10.8 km | route proximity |
| Port Arthur Gas Pipeline | Proposed | 0 km | 0.72 bcm/y | 10.8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 0.77 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 14 km | 3.51 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Cancelled | 5 km | 0.3 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 5 km | 1.09 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 2 km | 0.71 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 777 km | 8.38 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 14 km | 0.53 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 11 km | 0.1 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 28 km | 0.97 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 1.02 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 53 km | 1.24 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 219 km | 1.33 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 24 km | 1.84 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 103 km | 3.05 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 0.82 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 224 km | 2.04 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 2 km | 0.63 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 1 km | 0.37 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 40 km | 2.81 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 1.79 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 1.02 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 0.99 bcm/y | 15 km | route proximity |
| Florida Gas Transmission Pipeline | Proposed | 0 km | 0.77 bcm/y | 15 km | route proximity |
| Creole Trail Pipeline | Cancelled | 168 km | 15.33 bcm/y | 15.5 km | route proximity |
| DeLa Express Pipeline | Proposed | 1,110 km | 20.44 bcm/y | 19.2 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 8,530 km | 10.83 bcm/y | 20.7 km | route proximity |
| Kinetica Energy Express | Operating | 1,139 km | — | 20.8 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Operating | 0 km | 7.67 bcm/y | 21.6 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Proposed | 5 km | 12.88 bcm/y | 21.6 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Operating | 2 km | 0.18 bcm/y | 21.6 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Proposed | 0 km | 0.33 bcm/y | 21.6 km | route proximity |
| Tennessee Gas Pipeline | Operating | 18,926 km | 10.22 bcm/y | 24.9 km | route proximity |
| Tennessee Gas Pipeline | Operating | 0 km | 9.14 bcm/y | 24.9 km | route proximity |
| Tennessee Gas Pipeline | Cancelled | 1,551 km | — | 24.9 km | route proximity |
| Tennessee Gas Pipeline | Cancelled | 547 km | 13.29 bcm/y | 24.9 km | route proximity |
Exposed to chokepoints
Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.
| Destination | Chokepoints on the usual route | Alternative route |
|---|---|---|
| East Asia | Panama CanalPanama slot availability and draught decide between these; the Cape is the fallback. | Suez CanalStrait of Malacca |
| South Asia | Suez CanalBab el-Mandeb | Cape of Good Hope |
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Lake Charles LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Lake Charles LNG Terminal?
- Lake Charles LNG Terminal is an LNG export terminal in Louisiana, United States. It is made up of 2 tracked trains and phases.
- Is Lake Charles LNG Terminal operating?
- Lake Charles LNG Terminal is proposed, with a first tracked start year of 1982. Nothing here should be read as a forecast that it will be built.
- How much LNG can Lake Charles LNG Terminal handle?
- Lake Charles LNG Terminal has 17.8 Mtpa proposed. Capacity at different statuses is never added together.
- Who owns Lake Charles LNG Terminal?
- Lake Charles LNG Terminal is owned by Lake Charles LNG Company LLC and Lake Charles LNG Export Company LLC, and operated by Lake Charles LNG Export Company LLC. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Lake Charles LNG Terminal pass?
- Cargoes from Lake Charles LNG Terminal would normally pass Panama Canal, Suez Canal, Bab el-Mandeb, Strait of Malacca and 1 other. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Lake Charles LNG Terminal?
- 70 tracked gas pipelines pass within 25 km of Lake Charles LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.