Company
Cheniere Energy
Cheniere Energy is linked to 4 LNG terminals, 9 pipelines and 0 carriers in the Global Energy Monitor tracker, as operator, parent company and owner, across Chile and United States. It is headquartered in United States. It is listed as LNG on NYSE.
Terminals linked
4
Pipelines linked
9
854 km of route
Operating capacity of linked terminals
74.9 Mtpa
whole-terminal figure, not pro-rated by stake
Carriers linked
0
Countries
2
Profile
- Headquarters
- United States
- Ticker
- LNG (NYSE)
- Website
- Not reported
- Also appears in GEM as
- Cheniere · Cheniere Energy Partners · Sabine Pass Liquefaction · Cheniere Energy Inc · Cheniere Energy Partners LP · Sabine Pass Liquefaction LLC
- Roles
- operator, parent company, owner
- Canonicalised by
- hand-maintained alias list
Linked terminals
Role and percentage exactly as GEM reports per unit; where a stake applies to only some units the unit names are listed.
| Terminal | Country | Type | Status | Role | Stake | Operating Mtpa |
|---|---|---|---|---|---|---|
| Corpus Christi LNG Terminal | United States | Export | Operating | OperatorStage 1 T01, Stage 1 T02, Stage 2 T03 | — | 15 |
| ParentStage 1 T01, Stage 1 T02, Stage 2 T03 | — | |||||
| OwnerStage 3 (T11-T12) Expansion, Stage 4 (T13-16) Expansion | 100% | |||||
| ParentStage 3 (T11-T12) Expansion, Stage 4 (T13-16) Expansion | 100% | |||||
| Creole Trail LNG Terminal | United States | Import | Cancelled | Owner | 100% | — |
| Parent | 100% | |||||
| Penco Lirquén FSRU | Chile | Import | Proposed | Owner | 50% | — |
| Parent | 50% | |||||
| Sabine Pass LNG Terminal | United States | Export | Operating | Owner | 100% | 59.9 |
| Operator | — | |||||
| Parent | 100% |
Linked gas pipelines
Role and percentage exactly as GEM reports per segment.
| Pipeline | Countries | Status | Role | Stake | Length | Capacity |
|---|---|---|---|---|---|---|
| ADCC Pipeline | United States | Proposed | Owner | — | — | 17.4 |
| Parent | — | |||||
| Corpus Christi Pipeline | United States | Operating | Owner | 100% | 37 | 23 |
| Parent | 100% | |||||
| Corpus Christi Pipeline | United States | Operating | Owner | 100% | 34 | 15.6 |
| Parent | 100% | |||||
| Creole Trail Pipeline | United States | Operating | Owner | 100% | 151 | 15.3 |
| Parent | 100% | |||||
| Creole Trail Pipeline | United States | Cancelled | Owner | 100% | 168 | 15.3 |
| Parent | 100% | |||||
| Creole Trail Pipeline | United States | Proposed | Owner | 100% | 0 | 9.5 |
| Midship Pipeline | United States | Operating | Parent | — | 375 | 11.2 |
| Sabine Crossing Gas Pipeline | United States | Proposed | Owner | 100% | 89 | 27.6 |
| Sabine Pass LNG Stage 5 Expansion Pipeline | United States | Proposed | Owner | 100% | — | — |
| Parent | 100% |
In our rankings
Where this appears in the site's generated top lists. Each ranking page states its own method before its table.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.