LNG Atlas

Export terminal · Texas, United States

Rio Grande LNG Terminal

Rio Grande LNG Terminal is an under construction LNG export terminal in Texas, United States. The tracker lists 7 tracked units with 23.6 Mtpa under construction, 23.4 Mtpa proposed. It is owned by NextDecade.

Operating

—

no units operating

Under construction

23.6 Mtpa

32.1 bcm/y · 4 units

Proposed

23.4 Mtpa

31.8 bcm/y · 2 units

At a glance

State / province
Texas
Region
Americas
Import / export
Export
Onshore / floating
Not reported
Status (rolled up)
Under construction
Trains / phases tracked
7
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
25.9508° N, 97.4108° W
GEM terminal ID
T100000130239
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
T6-T8Proposed1824.5—2025Not reportedRio Grande LNG LLC [100%]
T1 (Phase 1)Under construction5.877.99——FIDRio Grande LNG LLC [100%]
T2 (Phase 1)Under construction5.877.99——FIDRio Grande LNG LLC [100%]
T3 (Phase 1)Under construction5.877.99——FIDRio Grande LNG LLC [100%]
T4 (Phase 2)Under construction68.16——FIDRio Grande LNG LLC [100%]
T5 (Phase 2)Proposed5.47.35——Pre-FIDRio Grande LNG LLC [100%]
T6 (original, cancelled proposal)Cancelled4.56.12——Not reportedRio Grande LNG LLC [100%]

Capacity by status

StatusUnitsMtpabcm/y
Under construction423.632.1
Proposed223.431.8
Cancelled14.56.12

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Reported cost

Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.

UnitStatusCapacityEstimated costPer tonne a year
T1 (Phase 1)Under construction5.87 Mtpa$6.13 billion$1,045
T2 (Phase 1)Under construction5.87 Mtpa$6.13 billion$1,045
T3 (Phase 1)Under construction5.87 Mtpa$6.13 billion$1,045
T4 (Phase 2)Under construction6 Mtpa$6.7 billion$1,117
T5 (Phase 2)Proposed5.4 Mtpa$6.7 billion$1,241

Financing as GEM records it: US$3.85 billion term loan facility at Rio Grande LNG Train 4, LLC; US$1.13 billion in equity commitments from NextDecade; and US$1.70 billion in equity commitments from partners Global Infrastructure Partners, a part of BlackRock; GIC; Mubadala Investment Company (together, the Financial Investors); and TotalEnergies

A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.

Location

Rio Grande LNG Terminal at 25.9508° N, 97.4108° W, with 8 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
25.9508° N, 97.4108° W
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Valley Crossing PipelineOperating275 km26.57 bcm/y5.4 kmroute proximity
Valley Crossing PipelineProposed0 km7.36 bcm/y5.4 kmroute proximity
Valley Crossing PipelineProposed16 km0 bcm/y5.4 kmroute proximity
Sur de Texas-Tuxpan Gas PipelineOperating770 km26.57 bcm/y7.6 kmroute proximity
Rio Bravo Pipeline ProjectProposed222 km45.99 bcm/y7.9 kmroute proximity
Sistema Nacional de Gasoductos (SNG)Operating8,611 km51.1 bcm/y15.2 kmroute proximity
Colpa-Rio Grande Gas PipelineOperating88 km2.5 bcm/y—name match
Yacuíba-Río Grande Gas PipelineOperating432 km7.3 bcm/y—name match

Technology and contractors

Firms named on this terminal in our curated supplier list, each backed by a public source on that firm's page.

Air Products

Licenses the AP-C3MR, AP-X, AP-DMR and AP-SMR liquefaction processes and manufactures the coil-wound heat exchangers at the cold heart of most large LNG trains.

Bechtel

Engineers and builds liquefaction trains, having delivered six trains at Sabine Pass and worked on Corpus Christi, Port Arthur and Rio Grande.

Vessels owned by the same companies

Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.

VesselViaStatusCapacityDelivered
BW BostonTotalEnergiesOperating138,000 m³2003

Exposed to chokepoints

Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.

DestinationChokepoints on the usual routeAlternative route
East AsiaPanama CanalPanama slot availability and draught decide between these; the Cape is the fallback.Suez CanalStrait of Malacca
South AsiaSuez CanalBab el-MandebCape of Good Hope

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Rio Grande LNG Terminal?
Rio Grande LNG Terminal is an LNG export terminal in Texas, United States. It is made up of 7 tracked trains and phases.
Is Rio Grande LNG Terminal operating?
Rio Grande LNG Terminal is under construction. Nothing here should be read as a forecast that it will be built.
How much LNG can Rio Grande LNG Terminal handle?
Rio Grande LNG Terminal has 23.6 Mtpa under construction, 23.4 Mtpa proposed. Capacity at different statuses is never added together.
Who owns Rio Grande LNG Terminal?
Rio Grande LNG Terminal is owned by NextDecade. Shares are as recorded in the current tracker release.
Which maritime chokepoints do cargoes from Rio Grande LNG Terminal pass?
Cargoes from Rio Grande LNG Terminal would normally pass Panama Canal, Suez Canal, Bab el-Mandeb, Strait of Malacca and 1 other. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
What pipelines connect to Rio Grande LNG Terminal?
8 tracked gas pipelines pass within 25 km of Rio Grande LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.