Gas transmission pipeline · Kingsville to Rio Grande LNG, Port of Brownsville
Rio Bravo Pipeline Project
Rio Bravo Pipeline Project is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 222 km long and 45.99 bcm/y of capacity, starting up in 2026. It runs from Kingsville to Rio Grande LNG, Port of Brownsville. It is owned by Rio Bravo Pipeline Co LLC.
Length
222 km
Capacity
46 bcm/y
33.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1016 mm (40 in)
Route
Rio Bravo Pipeline Project runs from Kingsville to Rio Grande LNG, Port of Brownsville. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Kingsville
- To
- Rio Grande LNG, Port of Brownsville
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 225 km
- GEM pipeline ID
- P0245
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Kingsville → Rio Grande LNG, Port of Brownsville | 222 | 46 | 1016 mm | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Texas LNG Terminal | United States | Export | Proposed | 0.4 km | route proximity |
| Rio Grande LNG Terminal | United States | Export | Under construction | 2.3 km | route proximity |
| Annova LNG Terminal | United States | Export | Cancelled | 7.9 km | route proximity |
| Barca LNG Terminal | United States | Export | Cancelled | 7.9 km | route proximity |
| Eos FLNG Terminal | United States | Export | Cancelled | 7.9 km | route proximity |
| Jupiter Offshore Loading Terminal (JOLT) | United States | Export | Cancelled | 23.3 km | route proximity |
| Cambodia LNG Project | Cambodia | Import | Cancelled | — | name match |
| Filipinas LNG Gateway Project FSRU | Philippines | Import | Shelved | — | name match |
| Project Venezuela LNG Terminal | Venezuela | Export | Cancelled | — | name match |
| Yakutia LNG Project | Russia | Export | Shelved | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Enbridge Inc100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Rio Bravo Pipeline Project run?
- Rio Bravo Pipeline Project runs from Kingsville to Rio Grande LNG, Port of Brownsville, crossing United States.
- How long is Rio Bravo Pipeline Project?
- Rio Bravo Pipeline Project is 222 km long.
- How much gas can Rio Bravo Pipeline Project carry?
- Rio Bravo Pipeline Project has a design capacity of 46 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Rio Bravo Pipeline Project operating?
- Rio Bravo Pipeline Project is proposed, with a reported start year of 2026.
- Who owns Rio Bravo Pipeline Project?
- Rio Bravo Pipeline Project is owned by Rio Bravo Pipeline Co LLC, as recorded in the current tracker release.
- Does Rio Bravo Pipeline Project serve an LNG terminal?
- Rio Bravo Pipeline Project passes within 25 km of 10 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.