LNG Chain

Gas transmission pipeline · Kingsville to Rio Grande LNG, Port of Brownsville

Rio Bravo Pipeline Project

Rio Bravo Pipeline Project is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 222 km long and 45.99 bcm/y of capacity, starting up in 2026. It runs from Kingsville to Rio Grande LNG, Port of Brownsville. It is owned by Rio Bravo Pipeline Co LLC.

Length

222 km

Capacity

46 bcm/y

33.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1016 mm (40 in)

Route

Rio Bravo Pipeline Project runs from Kingsville to Rio Grande LNG, Port of Brownsville. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Kingsville
To
Rio Grande LNG, Port of Brownsville
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
225 km
GEM pipeline ID
P0245
Start year
2026
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedKingsville → Rio Grande LNG, Port of Brownsville222461016 mm2026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Texas LNG TerminalUnited StatesExportProposed0.4 kmroute proximity
Rio Grande LNG TerminalUnited StatesExportUnder construction2.3 kmroute proximity
Annova LNG TerminalUnited StatesExportCancelled7.9 kmroute proximity
Barca LNG TerminalUnited StatesExportCancelled7.9 kmroute proximity
Eos FLNG TerminalUnited StatesExportCancelled7.9 kmroute proximity
Jupiter Offshore Loading Terminal (JOLT)United StatesExportCancelled23.3 kmroute proximity
Cambodia LNG ProjectCambodiaImportCancelledname match
Filipinas LNG Gateway Project FSRUPhilippinesImportShelvedname match
Project Venezuela LNG TerminalVenezuelaExportCancelledname match
Yakutia LNG ProjectRussiaExportShelvedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Rio Bravo Pipeline Project run?
Rio Bravo Pipeline Project runs from Kingsville to Rio Grande LNG, Port of Brownsville, crossing United States.
How long is Rio Bravo Pipeline Project?
Rio Bravo Pipeline Project is 222 km long.
How much gas can Rio Bravo Pipeline Project carry?
Rio Bravo Pipeline Project has a design capacity of 46 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Rio Bravo Pipeline Project operating?
Rio Bravo Pipeline Project is proposed, with a reported start year of 2026.
Who owns Rio Bravo Pipeline Project?
Rio Bravo Pipeline Project is owned by Rio Bravo Pipeline Co LLC, as recorded in the current tracker release.
Does Rio Bravo Pipeline Project serve an LNG terminal?
Rio Bravo Pipeline Project passes within 25 km of 10 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.