Import terminal · Italy
Ravenna FSRU
Ravenna FSRU is an operating LNG import terminal (floating storage and regasification unit (FSRU)) in Italy. The tracker lists 1 tracked unit with 3.68 Mtpa operating, the earliest starting in 2025. It is owned by Snam SpA.
Operating
3.68 Mtpa
5 bcm/y · 1 unit
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Operating | 3.68 | 5 | 2025 | — | Not reported | Snam SpA [100%] |
Some units are reported by GEM in bcm/y; Mtpa is derived at 1 Mtpa = 1.36 bcm/y.
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 1 | 3.68 | 5 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
Ravenna FSRU at 44.4636° N, 12.3974° E, with 3 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 44.4636° N, 12.3974° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Ravenna-Recanati Gas Pipeline | Operating | 172 km | — | 11.3 km | route proximity |
| Campagna Lupia–Ravenna Gas Pipeline | Operating | 109 km | — | 15.9 km | route proximity |
| Minerbio–Ravenna Terra Gas Pipeline | Operating | 59 km | — | 15.9 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Gibraltar
- Suez Canal
- Bab el-Mandeb
- Danish Straits
Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Ravenna FSRU?
- Ravenna FSRU is an LNG import terminal in Italy. It is made up of 1 tracked train or phase.
- Is Ravenna FSRU operating?
- Ravenna FSRU is operating, with its first tracked train starting in 2025.
- How much LNG can Ravenna FSRU handle?
- Ravenna FSRU has 3.68 Mtpa operating, equivalent to 5 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns Ravenna FSRU?
- Ravenna FSRU is owned by Snam SpA, and operated by BW LNG and Snam SpA. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Ravenna FSRU pass?
- Cargoes from Ravenna FSRU would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Ravenna FSRU?
- 3 tracked gas pipelines pass within 25 km of Ravenna FSRU. Proximity is not proof of a physical connection; each match is listed with its distance.