Import terminal · Primorje-Gorski Kotar, Croatia

Krk FSRU

Krk FSRU is an operating LNG import terminal (floating storage and regasification unit (FSRU)) in Primorje-Gorski Kotar, Croatia. The tracker lists 4 tracked units with 2.13 Mtpa operating, 2.35 Mtpa under construction, 3.01 Mtpa proposed, the earliest starting in 2021. Owners include HEP Grupa, Plinacro doo, LNG Croatia LLC and others.

Operating

2.13 Mtpa

2.9 bcm/y · 2 units

Under construction

2.35 Mtpa

3.2 bcm/y · 1 unit

Proposed

3.01 Mtpa

4.09 bcm/y · 1 unit

At a glance

Country
Croatia
State / province
Primorje-Gorski Kotar
Region
Europe
Import / export
Import
Onshore / floating
FSRU
Status (rolled up)
Operating
Trains / phases tracked
4
Earliest start year
2021
Latest start year
2022
Coordinates
45.2005° N, 14.5338° E
GEM terminal ID
T100000130430
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedOperating1.912.620212015FIDHEP Grupa [85%]; Plinacro doo [15%]
2022 Capacity ExpansionOperating0.220.32022—Not reportedHEP Grupa [85%]; Plinacro doo [15%]
Phase 2 Expansion (Onshore)Proposed3.014.1—2022Not reportedLNG Croatia LLC
Phase 1 ExpansionUnder construction2.353.2——FIDLNG Croatia LLC

Capacity by status

StatusUnitsMtpabcm/y
Operating22.132.9
Under construction12.353.2
Proposed13.014.09

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Owners

Parent companies

Operators

Reported cost

Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.

UnitStatusCapacityEstimated costPer tonne a year
Not reportedOperating1.91 Mtpa$255 million233,600,000 EUR as reported$133
Phase 1 ExpansionUnder construction2.35 Mtpa$27.3 million25,000,000 EUR as reported$12

Financing as GEM records it: Connecting Europe Facility (CEF) grant (2014) of €4,758,382 (US$5,788,847),CEF grant (2015) of €514,994 (US$626,528),CEF grant (2016) of €747,000 (US$908,849),CEF grant (2016) of €101,400,000 (US$111.2 million),Croatian government grant of €100 million (US$109.4 million),Equity investment of €32.2 million (US$35.3 million) from HEP and Plinacro · €25 million from the European Commission

A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.

Location

Krk FSRU at 45.2005° N, 14.5338° E, with 7 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
45.2005° N, 14.5338° E
Coordinate accuracy (GEM)
exact
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipelineOperating18 km2.63 bcm/y2.2 kmroute proximity
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipelineOperating58 km1.84 bcm/y2.2 kmroute proximity
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipelineProposed102 km1.84 bcm/y2.2 kmroute proximity
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipelineProposed20 km1.84 bcm/y2.2 kmroute proximity
Bosiljevo–Rjeka Gas PipelineOperating81 km—15.5 kmroute proximity
Rijeka–Pula Gas PipelineOperating95 km—17.7 kmroute proximity
Kalce-Kastav Gas PipelineShelved63 km—23.6 kmroute proximity

Supplied via

Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.

Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Krk FSRU?
Krk FSRU is an LNG import terminal in Primorje-Gorski Kotar, Croatia. It is made up of 4 tracked trains and phases.
Is Krk FSRU operating?
Krk FSRU is operating, with its first tracked train starting in 2021.
How much LNG can Krk FSRU handle?
Krk FSRU has 2.13 Mtpa operating, 2.35 Mtpa under construction, 3.01 Mtpa proposed, equivalent to 2.9 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
Who owns Krk FSRU?
Krk FSRU is owned by HEP Grupa, Plinacro doo and LNG Croatia LLC, and operated by Golar LNG Ltd. Shares are as recorded in the current tracker release.
Which maritime chokepoints do cargoes from Krk FSRU pass?
Cargoes from Krk FSRU would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
What pipelines connect to Krk FSRU?
7 tracked gas pipelines pass within 25 km of Krk FSRU. Proximity is not proof of a physical connection; each match is listed with its distance.