LNG Atlas

Import terminal · Primorje-Gorski Kotar, Croatia

Adria LNG Terminal

Adria LNG Terminal is a cancelled LNG import terminal in Primorje-Gorski Kotar, Croatia. The tracker lists 1 tracked unit; capacity is not reported. Owners include RWE AG, TotalEnergies, E.ON SE and 2 others.

Operating

—

no units operating

Under construction

—

no units under construction

Proposed

—

no units proposed

At a glance

Country
Croatia
State / province
Primorje-Gorski Kotar
Region
Europe
Import / export
Import
Onshore / floating
Not reported
Status (rolled up)
Cancelled
Trains / phases tracked
1
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
45.2119° N, 14.5542° E
GEM terminal ID
T100000130428
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedCancelled79.52——Pre-FIDRWE AG; TotalEnergies SE; E.ON SE; Geoplin; OMV AG

Capacity by status

StatusUnitsMtpabcm/y
Cancelled179.52

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Location

Adria LNG Terminal at 45.2119° N, 14.5542° E, with 7 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
45.2119° N, 14.5542° E
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipelineOperating18 km2.63 bcm/y0.3 kmroute proximity
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipelineProposed102 km1.84 bcm/y0.3 kmroute proximity
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipelineProposed20 km1.84 bcm/y0.3 kmroute proximity
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipelineOperating58 km1.84 bcm/y0.5 kmroute proximity
Bosiljevo–Rjeka Gas PipelineOperating81 km—13.6 kmroute proximity
Rijeka–Pula Gas PipelineOperating95 km—17.4 kmroute proximity
Kalce-Kastav Gas PipelineShelved63 km—23.8 kmroute proximity

Vessels owned by the same companies

Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.

VesselViaStatusCapacityDelivered
BW BostonTotalEnergiesOperating138,000 m³2003

Supplied via

Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.

Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Adria LNG Terminal?
Adria LNG Terminal is an LNG import terminal in Primorje-Gorski Kotar, Croatia. It is made up of 1 tracked train or phase.
Is Adria LNG Terminal operating?
Adria LNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
How much LNG can Adria LNG Terminal handle?
Global Energy Monitor reports no capacity for Adria LNG Terminal, so none is shown. That is an absent figure, not a zero.
Who owns Adria LNG Terminal?
Adria LNG Terminal is owned by E.ON SE, Geoplin, OMV AG and 2 others. Shares are as recorded in the current tracker release.
Which maritime chokepoints do cargoes from Adria LNG Terminal pass?
Cargoes from Adria LNG Terminal would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
What pipelines connect to Adria LNG Terminal?
7 tracked gas pipelines pass within 25 km of Adria LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail