Import terminal · Primorje-Gorski Kotar, Croatia
Adria LNG Terminal
Adria LNG Terminal is a cancelled LNG import terminal in Primorje-Gorski Kotar, Croatia. The tracker lists 1 tracked unit; capacity is not reported. Owners include E.ON SE, Geoplin, OMV AG and 2 others.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
- Country
- Croatia
- State / province
- Primorje-Gorski Kotar
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Cancelled
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 45.2119° N, 14.5542° E
- GEM terminal ID
- T100000130428
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Cancelled | 7 | 9.52 | — | — | Not reported | E.ON SE; Geoplin [TO BE DELETED]; OMV AG; RWE AG; TotalEnergies SE |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 7 | 9.52 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
Adria LNG Terminal at 45.2119° N, 14.5542° E, with 5 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 45.2119° N, 14.5542° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline | Operating | 18 km | 2.63 bcm/y | 0.3 km | route proximity |
| Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline | Operating | 58 km | 1.84 bcm/y | 0.5 km | route proximity |
| Bosiljevo–Rjeka Gas Pipeline | Operating | 81 km | — | 13.6 km | route proximity |
| Rijeka–Pula Gas Pipeline | Operating | 95 km | — | 17.4 km | route proximity |
| Kalce-Kastav Gas Pipeline | Shelved | 63 km | — | 23.8 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Gibraltar
- Suez Canal
- Bab el-Mandeb
- Danish Straits
Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Adria LNG Terminal?
- Adria LNG Terminal is an LNG import terminal in Primorje-Gorski Kotar, Croatia. It is made up of 1 tracked train or phase.
- Is Adria LNG Terminal operating?
- Adria LNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
- How much LNG can Adria LNG Terminal handle?
- Global Energy Monitor reports no capacity for Adria LNG Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Adria LNG Terminal?
- Adria LNG Terminal is owned by E.ON SE, Geoplin, OMV AG and 2 others. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Adria LNG Terminal pass?
- Cargoes from Adria LNG Terminal would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Adria LNG Terminal?
- 5 tracked gas pipelines pass within 25 km of Adria LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.