LNG Atlas

Export terminal · Cabo Delgado, Mozambique

Coral North FLNG Terminal

Coral North FLNG Terminal is a proposed LNG export terminal (floating liquefaction (FLNG) facility) in Cabo Delgado, Mozambique. The tracker lists 1 tracked unit with 3.4 Mtpa proposed. Owners include ExxonMobil, Eni, KOGAS Canada Ltd and 3 others.

Operating

—

no units operating

Under construction

—

no units under construction

Proposed

3.4 Mtpa

4.62 bcm/y · 1 unit

At a glance

Country
Mozambique
State / province
Cabo Delgado
Region
Africa
Import / export
Export
Onshore / floating
FLNG
Status (rolled up)
Proposed
Trains / phases tracked
1
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
10.9000° S, 41.2000° E
GEM terminal ID
T100000131124
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedProposed3.44.63—2022FIDExxon Mobil Corp [25%]; Eni SpA [25%]; KOGAS Canada Ltd [10%]; Empresa Nacional de Hidrocarbonetos EP [10%]; China National Petroleum Corp [20%]; Abu Dhabi National Oil Co [10%]

Capacity by status

StatusUnitsMtpabcm/y
Proposed13.44.62

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Reported cost

Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.

UnitStatusCapacityEstimated costPer tonne a year
Not reportedProposed3.4 Mtpa$7.2 billion$2,118

A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.

Location

Coral North FLNG Terminal at 10.9000° S, 41.2000° E.

Loads about 250 kB of map code and the country outline file.

Coordinates
10.9000° S, 41.2000° E
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

No tracked gas pipeline passes within 25 km of this terminal in the current release.

Exposed to chokepoints

Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.

DestinationChokepoints on the usual routeAlternative route
EuropeCape of Good HopeBab el-MandebSuez Canal

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Coral North FLNG Terminal?
Coral North FLNG Terminal is an LNG export terminal in Cabo Delgado, Mozambique. It is made up of 1 tracked train or phase.
Is Coral North FLNG Terminal operating?
Coral North FLNG Terminal is proposed. Nothing here should be read as a forecast that it will be built.
How much LNG can Coral North FLNG Terminal handle?
Coral North FLNG Terminal has 3.4 Mtpa proposed. Capacity at different statuses is never added together.
Who owns Coral North FLNG Terminal?
Coral North FLNG Terminal is owned by Eni, ExxonMobil, CNPC and 3 others, and operated by Eni. Shares are as recorded in the current tracker release.
Which maritime chokepoints do cargoes from Coral North FLNG Terminal pass?
Cargoes from Coral North FLNG Terminal would normally pass Cape of Good Hope, Bab el-Mandeb and Suez Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail