LNG Atlas

Export terminal · Lindi, Tanzania

Tanzania LNG Terminal

Tanzania LNG Terminal is a proposed LNG export terminal in Lindi, Tanzania. The tracker lists 2 tracked units with 10 Mtpa proposed. Owners include Tanzania Petroleum Development Corp, Pavilion Energy, ExxonMobil and 3 others.

Operating

—

no units operating

Under construction

—

no units under construction

Proposed

10 Mtpa

13.6 bcm/y · 2 units

At a glance

Country
Tanzania
State / province
Lindi
Region
Africa
Import / export
Export
Onshore / floating
Not reported
Status (rolled up)
Proposed
Trains / phases tracked
2
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
9.9600° S, 39.7089° E
GEM terminal ID
T100000130263
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
T1Proposed56.8—2016Pre-FIDTanzania Petroleum Development Corp; Pavilion Energy; Exxon Mobil Corp; Equinor ASA; Shell PLC; PT Medco Energi Internasional Tbk
T2Proposed56.8—2016Pre-FIDTanzania Petroleum Development Corp; Pavilion Energy; Exxon Mobil Corp; Equinor ASA; Shell PLC; PT Medco Energi Internasional Tbk

Capacity by status

StatusUnitsMtpabcm/y
Proposed21013.6

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Reported cost

Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.

UnitStatusCapacityEstimated costPer tonne a year
T1Proposed5 Mtpa$21 billion$4,200
T2Proposed5 Mtpa$21 billion$4,200

A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.

Location

Tanzania LNG Terminal at 9.9600° S, 39.7089° E, with 3 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
9.9600° S, 39.7089° E
Coordinate accuracy (GEM)
exact
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Mtwara–Dar es Salaam Gas PipelineOperating535 km8.1 bcm/y7.4 kmroute proximity
Tanzania–Kenya Gas PipelineProposed600 km——name match
Uganda Tanzania PipelineShelved1,275 km——name match

Vessels owned by the same companies

Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.

VesselViaStatusCapacityDelivered
Arctic DiscovererEquinorOperating142,600 m³2006
Arctic PrincessEquinorOperating148,000 m³2006
Arctic VoyagerEquinorOperating142,800 m³2006
Methane Nile EagleShellOperating145,000 m³2007
Methane Rita AndreaShellOperating145,000 m³2006
Shandong JuniperShellOperating135,000 m³2004

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Tanzania LNG Terminal?
Tanzania LNG Terminal is an LNG export terminal in Lindi, Tanzania. It is made up of 2 tracked trains and phases.
Is Tanzania LNG Terminal operating?
Tanzania LNG Terminal is proposed. Nothing here should be read as a forecast that it will be built.
How much LNG can Tanzania LNG Terminal handle?
Tanzania LNG Terminal has 10 Mtpa proposed. Capacity at different statuses is never added together.
Who owns Tanzania LNG Terminal?
Tanzania LNG Terminal is owned by Equinor ASA, ExxonMobil, Pavilion Energy and 3 others, and operated by Equinor and Shell. Shares are as recorded in the current tracker release.
What pipelines connect to Tanzania LNG Terminal?
3 tracked gas pipelines pass within 25 km of Tanzania LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail