LNG Atlas

Gas transmission pipeline · Utah to Arizona

Western Energy Storage and Transportation Header Project

Western Energy Storage and Transportation Header Project is a cancelled gas transmission pipeline in United States. The tracker lists 1 tracked segment, 1,046 km long and 20.44 bcm/y of capacity, starting up in 2021. It runs from Utah to Arizona. It is owned by Magnum Energy Midstream Holdings.

Length

1,046 km

Capacity

20.4 bcm/y

15.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 610 mm (24 in)

Route

Western Energy Storage and Transportation Header Project runs from Utah to Arizona. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Utah
To
Arizona
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
1,098 km
GEM pipeline ID
P0304
Start year
2021
Cancelled (year GEM records)
2020
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledUtah → Arizona1,04620.4610 mm2021GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Andes Energy TerminalColombiaImportProposed—name match
Arrow Energy LNG TerminalAustraliaExportCancelled—name match
Batangas Clean Energy LNG TerminalPhilippinesImportProposed—name match
Cambodia LNG ProjectCambodiaImportCancelled—name match
Caofeidian LNG Terminal (Beijing Energy)ChinaImportCancelled—name match
Fermeuse Energy FLNG TerminalCanadaExportProposed—name match
Filipinas LNG Gateway Project FSRUPhilippinesImportUnder construction—name match
H-Energy Kakinada LNG TerminalIndiaImportShelved—name match
Hainan Shennan LNG Storage FacilityChinaImportOperating—name match
Ingleside Energy LNG TerminalUnited StatesExportCancelled—name match
Jiangyin LNG Terminal (Zhongtian Energy)ChinaImportShelved—name match
Liuheng LNG Terminal (Zhejiang Energy)ChinaImportUnder construction—name match
Main Pass Energy Hub FLNG TerminalUnited StatesExportCancelled—name match
NewTimes Energy LNG TerminalCanadaExportCancelled—name match
PAWA PNG FSRU ProjectPapua New GuineaImportShelved—name match
Project Venezuela LNG TerminalVenezuelaExportCancelled—name match
Safe Harbor Energy LNG TerminalUnited StatesImportCancelled—name match
Stewart Energy LNG TerminalCanadaExportCancelled—name match
Western LNG TerminalPapua New GuineaExportCancelled—name match
Wuhaogou LNG Storage FacilityChinaImportOperating—name match
Yakutia LNG ProjectRussiaExportProposed—name match
Zeeland Energy FSRUNetherlandsImportProposed—name match
Zhangzhou LNG Terminal (China Energy Reserve)ChinaImportShelved—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Western Energy Storage and Transportation Header Project run?
Western Energy Storage and Transportation Header Project runs from Utah to Arizona, crossing United States.
How long is Western Energy Storage and Transportation Header Project?
Western Energy Storage and Transportation Header Project is 1,046 km long.
How much gas can Western Energy Storage and Transportation Header Project carry?
Western Energy Storage and Transportation Header Project has a design capacity of 20.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Western Energy Storage and Transportation Header Project operating?
Western Energy Storage and Transportation Header Project is cancelled, with a reported start year of 2021.
Who owns Western Energy Storage and Transportation Header Project?
Western Energy Storage and Transportation Header Project is owned by Magnum Energy Midstream Holdings, as recorded in the current tracker release.
Does Western Energy Storage and Transportation Header Project serve an LNG terminal?
Western Energy Storage and Transportation Header Project passes within 25 km of 23 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in United States

Listed in name order among the 515 pipelines tracked in United States, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail