Import terminal · Texas, United States
Vista Del Sol LNG Terminal
Vista Del Sol LNG Terminal is a cancelled LNG import terminal in Texas, United States. The tracker lists 1 tracked unit; capacity is not reported. It is owned by 4Gas BV.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
- Country
- United States
- State / province
- Texas
- Region
- Americas
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Cancelled
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 27.8742° N, 97.2083° W
- GEM terminal ID
- T100000130843
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Cancelled | 8 | 10.9 | — | — | Not reported | 4Gas BV [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 8 | 10.9 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
Vista Del Sol LNG Terminal at 27.8742° N, 97.2083° W, with 34 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 27.8742° N, 97.2083° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Tennessee Gas Pipeline | Operating | 18,926 km | 10.22 bcm/y | 3 km | route proximity |
| Tennessee Gas Pipeline | Operating | 0 km | 9.14 bcm/y | 3 km | route proximity |
| Tennessee Gas Pipeline | Cancelled | 1,551 km | — | 3 km | route proximity |
| Tennessee Gas Pipeline | Cancelled | 547 km | 13.29 bcm/y | 3 km | route proximity |
| Corpus Christi Pipeline | Operating | 37 km | 23 bcm/y | 6.4 km | route proximity |
| Corpus Christi Pipeline | Operating | 34 km | 15.64 bcm/y | 7.6 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 8,530 km | 10.83 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 14 km | 3.51 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Cancelled | 5 km | 0.3 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 5 km | 1.09 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 2 km | 0.71 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 777 km | 8.38 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 14 km | 0.53 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 11 km | 0.1 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 28 km | 0.97 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 1.02 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 53 km | 1.24 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 219 km | 1.33 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 24 km | 1.84 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 103 km | 3.05 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 0.82 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 224 km | 2.04 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 2 km | 0.63 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 1 km | 0.37 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 40 km | 2.81 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 1.79 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 1.02 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 0 km | 0.99 bcm/y | 8 km | route proximity |
| Florida Gas Transmission Pipeline | Proposed | 0 km | 0.77 bcm/y | 8 km | route proximity |
| Houston Gas Pipeline (HPL) System | Operating | 6,116 km | 54.17 bcm/y | 10.9 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Operating | 14,202 km | 119.47 bcm/y | 13.7 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Proposed | 5 km | 12.88 bcm/y | 13.7 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Operating | 2 km | 0.18 bcm/y | 13.7 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Proposed | 0 km | 0.33 bcm/y | 13.7 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Vista Del Sol LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Vista Del Sol LNG Terminal?
- Vista Del Sol LNG Terminal is an LNG import terminal in Texas, United States. It is made up of 1 tracked train or phase.
- Is Vista Del Sol LNG Terminal operating?
- Vista Del Sol LNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
- How much LNG can Vista Del Sol LNG Terminal handle?
- Global Energy Monitor reports no capacity for Vista Del Sol LNG Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Vista Del Sol LNG Terminal?
- Vista Del Sol LNG Terminal is owned by 4Gas BV. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Vista Del Sol LNG Terminal pass?
- Cargoes from Vista Del Sol LNG Terminal would normally pass Panama Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Vista Del Sol LNG Terminal?
- 34 tracked gas pipelines pass within 25 km of Vista Del Sol LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.