Ruwais LNG Terminal is an under construction LNG export terminal in Abu Dhabi, United Arab Emirates. The tracker lists 2 tracked units with 9.6 Mtpa under construction. Owners include TotalEnergies, BP, Abu Dhabi Gas Liquefaction Company Ltd and 2 others.

Operating

—

no units operating

Under construction

9.6 Mtpa

13.1 bcm/y · 2 units

Proposed

—

no units proposed

At a glance

State / province
Abu Dhabi
Region
Asia
Import / export
Export
Onshore / floating
Not reported
Status (rolled up)
Under construction
Trains / phases tracked
2
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
24.1352° N, 52.6523° E
GEM terminal ID
T100000131105
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
T1Under construction4.86.53—2023FIDTotalEnergies SE [10%]; BP PLC [10%]; Abu Dhabi Gas Liquefaction Company Ltd [60%]; Shell PLC [10%]; Mitsui & Co Ltd [10%]
T2Under construction4.86.53—2023FIDTotalEnergies SE [10%]; BP PLC [10%]; Abu Dhabi Gas Liquefaction Company Ltd [60%]; Shell PLC [10%]; Mitsui & Co Ltd [10%]

Capacity by status

StatusUnitsMtpabcm/y
Under construction29.613.1

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Location

Ruwais LNG Terminal at 24.1352° N, 52.6523° E, with 2 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
24.1352° N, 52.6523° E
Coordinate accuracy (GEM)
exact
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
ESTIDAMA Gas PipelineUnder construction181 km—0.4 kmroute proximity
Bab-Habshan–Ruwais gas PipelineOperating100 km—6.4 kmroute proximity

Vessels owned by the same companies

Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.

VesselViaStatusCapacityDelivered
Al AamriyaMitsui & Co.Operating216,200 m³2008
Al OraiqMitsui & Co.Operating210,200 m³2008
Al SahlaMitsui & Co.Operating216,200 m³2008
Al ThumamaMitsui & Co.Operating216,200 m³2008
Al UtouriyaMitsui & Co.Operating215,000 m³2008
Arctic DiscovererMitsui & Co.Operating142,600 m³2006
Arctic VoyagerMitsui & Co.Operating142,800 m³2006
BW BostonTotalEnergiesOperating138,000 m³2003
British AchieverBPOperating173,400 m³2018
British ContributorBPOperating173,400 m³2018
British ListenerBPOperating173,400 m³2019
British MentorBPOperating173,400 m³2019
British PartnerBPOperating173,400 m³2018
British SponsorBPOperating173,400 m³2019
Cool RangerBPOperating155,000 m³2008
Cool RiderBPOperating155,000 m³2007
Cool RoverBPOperating155,000 m³2008
CubalMitsui & Co.Operating160,000 m³2012
EjnanMitsui & Co.Operating145,000 m³2007
FraihaMitsui & Co.Operating210,100 m³2008
Kmarin DiamondBPOperating155,000 m³2008
LobitoMitsui & Co.Operating160,400 m³2011
MalanjeMitsui & Co.Operating160,400 m³2011
Methane Nile EagleShellOperating145,000 m³2007
Methane Rita AndreaShellOperating145,000 m³2006
MurwabMitsui & Co.Operating210,100 m³2008
Pacific EnlightenMitsui & Co.Operating145,000 m³2009
Shandong JuniperShellOperating135,000 m³2004
Sonangol BenguelaMitsui & Co.Operating160,000 m³2011
Sonangol EtoshaMitsui & Co.Operating160,000 m³2011
Sonangol SambizangaMitsui & Co.Operating160,000 m³2011
SoyoMitsui & Co.Operating160,400 m³2011
Taitar No. 1Mitsui & Co.Operating145,300 m³2009
Taitar No. 4Mitsui & Co.Operating145,300 m³2010
Umm Al AmadMitsui & Co.Operating210,200 m³2008

Exposed to chokepoints

Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.

DestinationChokepoints on the usual routeAlternative route
East AsiaStrait of HormuzStrait of Malacca—

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Ruwais LNG Terminal?
Ruwais LNG Terminal is an LNG export terminal in Abu Dhabi, United Arab Emirates. It is made up of 2 tracked trains and phases.
Is Ruwais LNG Terminal operating?
Ruwais LNG Terminal is under construction. Nothing here should be read as a forecast that it will be built.
How much LNG can Ruwais LNG Terminal handle?
Ruwais LNG Terminal has 9.6 Mtpa under construction. Capacity at different statuses is never added together.
Who owns Ruwais LNG Terminal?
Ruwais LNG Terminal is owned by Abu Dhabi Gas Liquefaction Company Ltd, BP, Mitsui & Co. and 2 others, and operated by Abu Dhabi Gas Liquefaction Company Ltd. Shares are as recorded in the current tracker release.
Which maritime chokepoints do cargoes from Ruwais LNG Terminal pass?
Cargoes from Ruwais LNG Terminal would normally pass Strait of Hormuz and Strait of Malacca. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
What pipelines connect to Ruwais LNG Terminal?
2 tracked gas pipelines pass within 25 km of Ruwais LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail