Gas transmission pipeline · Bab-Habshan oil & gas field to Ruwais
Bab-Habshan–Ruwais gas Pipeline
Bab-Habshan–Ruwais gas Pipeline is an operating gas transmission pipeline in United Arab Emirates. The tracker lists 1 tracked segment, 100 km long. It runs from Bab-Habshan oil & gas field to Ruwais. Owners include ADNOC, Shell, TotalEnergies and 1 more.
Length
100 km
Capacity
Not reported
Segments tracked
1
Largest diameter 762 mm (30 in)
Route
Bab-Habshan–Ruwais gas Pipeline runs from Bab-Habshan oil & gas field to Ruwais. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Bab-Habshan oil & gas field
- To
- Ruwais
- Start country
- United Arab Emirates
- End country
- United Arab Emirates
- Countries crossed
- United Arab Emirates
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 100 km
- GEM pipeline ID
- P0515
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Bab-Habshan oil & gas field → Ruwais | 100 | Not reported | 762 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Ruwais FSRU | United Arab Emirates | Import | Operating | 4.7 km | route proximity |
| Ruwais LNG Terminal | United Arab Emirates | Export | Under construction | 6.4 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- ADNOC68%
- Shell15%
- TotalEnergies15%
- Partex2%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Bab-Habshan–Ruwais gas Pipeline run?
- Bab-Habshan–Ruwais gas Pipeline runs from Bab-Habshan oil & gas field to Ruwais, crossing United Arab Emirates.
- How long is Bab-Habshan–Ruwais gas Pipeline?
- Bab-Habshan–Ruwais gas Pipeline is 100 km long.
- How much gas can Bab-Habshan–Ruwais gas Pipeline carry?
- No design capacity is reported for Bab-Habshan–Ruwais gas Pipeline. That is an absent figure, not a zero.
- Is Bab-Habshan–Ruwais gas Pipeline operating?
- Bab-Habshan–Ruwais gas Pipeline is operating.
- Who owns Bab-Habshan–Ruwais gas Pipeline?
- Bab-Habshan–Ruwais gas Pipeline is owned by ADNOC, Shell, TotalEnergies and 1 other, as recorded in the current tracker release.
- Does Bab-Habshan–Ruwais gas Pipeline serve an LNG terminal?
- Bab-Habshan–Ruwais gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.