Gas transmission pipeline · Habshan to Al Ruwais Industrial City

ESTIDAMA Gas Pipeline

ESTIDAMA Gas Pipeline is an under construction gas transmission pipeline in United Arab Emirates. The tracker lists 1 tracked segment, 181 km long, starting up in 2028. It runs from Habshan to Al Ruwais Industrial City. It is owned by ADNOC.

Length

181 km

Capacity

Not reported

Segments tracked

1

Largest diameter 1422 mm (56 in)

Route

ESTIDAMA Gas Pipeline runs from Habshan to Al Ruwais Industrial City. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Habshan
To
Al Ruwais Industrial City
Start country
United Arab Emirates
End country
United Arab Emirates
Countries crossed
United Arab Emirates
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
124 km
GEM pipeline ID
P7684
Start year
2028
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Package 8Under constructionHabshan → Al Ruwais Industrial City181Not reported1422 mm2028GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Ruwais LNG TerminalUnited Arab EmiratesExportUnder construction0.4 kmroute proximity
Ruwais FSRUUnited Arab EmiratesImportOperating4.6 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does ESTIDAMA Gas Pipeline run?
ESTIDAMA Gas Pipeline runs from Habshan to Al Ruwais Industrial City, crossing United Arab Emirates.
How long is ESTIDAMA Gas Pipeline?
ESTIDAMA Gas Pipeline is 181 km long.
How much gas can ESTIDAMA Gas Pipeline carry?
No design capacity is reported for ESTIDAMA Gas Pipeline. That is an absent figure, not a zero.
Is ESTIDAMA Gas Pipeline operating?
ESTIDAMA Gas Pipeline is under construction, with a reported start year of 2028.
Who owns ESTIDAMA Gas Pipeline?
ESTIDAMA Gas Pipeline is owned by ADNOC, as recorded in the current tracker release.
Does ESTIDAMA Gas Pipeline serve an LNG terminal?
ESTIDAMA Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.