Import terminal · Gujarat, India
Hazira LNG Terminal
Hazira LNG Terminal is an operating LNG import terminal in Gujarat, India. The tracker lists 3 tracked units with 5.2 Mtpa operating, 19.9 Mtpa proposed, the earliest starting in 2005. It is owned by Shell Energy India Pvt Ltd.
Operating
5.2 Mtpa
7.07 bcm/y · 1 unit
Under construction
—
no units under construction
Proposed
19.9 Mtpa
27.1 bcm/y · 1 unit
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Operating | 5.2 | 7.07 | 2005 | — | Not reported | Shell Energy India Pvt Ltd [100%] |
| Expansion (Original Proposal) | Cancelled | 5 | 6.8 | — | 2017 | Not reported | Shell Energy India Pvt Ltd [100%] |
| Expansion (Updated Proposal) | Proposed | 19.9 | 27.1 | — | — | Not reported | Shell Energy India Pvt Ltd [100%] |
Capacity by status
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Parent companies
- Shell100%
Reported cost
Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.
| Unit | Status | Capacity | Estimated cost | Per tonne a year |
|---|---|---|---|---|
| Expansion (Updated Proposal) | Proposed | 19.9 Mtpa | $2.81 billion216,000,000,000 INR as reported | $141 |
A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.
Location
Hazira LNG Terminal at 21.0980° N, 72.6240° E, with 6 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 21.0980° N, 72.6240° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Low Pressure Gujarat Gas Grid Network | Operating | 58 km | 4.38 bcm/y | 6.8 km | route proximity |
| Hazira-Ankleshwar Gas Pipeline | Operating | 73 km | 1.85 bcm/y | 9 km | route proximity |
| Hazira-Vijaipur-Jagdishpur (HVJ) Gas Pipeline | Operating | 2,887 km | 39.06 bcm/y | 9.2 km | route proximity |
| Vijaipur-Dadri Gas Pipeline (GREP-II) | Operating | 505 km | 39.06 bcm/y | 9.2 km | route proximity |
| Surat-Paradip Gas Pipeline | Cancelled | 2,112 km | 27.3 bcm/y | 20.6 km | route proximity |
| High Pressure Gujarat Gas Grid Network | Operating | 2,207 km | 11.32 bcm/y | 24.1 km | route proximity |
Vessels owned by the same companies
Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.
| Vessel | Via | Status | Capacity | Delivered |
|---|---|---|---|---|
| Methane Nile Eagle | Shell | Operating | 145,000 m³ | 2007 |
| Methane Rita Andrea | Shell | Operating | 145,000 m³ | 2006 |
| Shandong Juniper | Shell | Operating | 135,000 m³ | 2004 |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Hazira LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Hazira LNG Terminal?
- Hazira LNG Terminal is an LNG import terminal in Gujarat, India. It is made up of 3 tracked trains and phases.
- Is Hazira LNG Terminal operating?
- Hazira LNG Terminal is operating, with its first tracked train starting in 2005.
- How much LNG can Hazira LNG Terminal handle?
- Hazira LNG Terminal has 5.2 Mtpa operating, 19.9 Mtpa proposed, equivalent to 7.07 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns Hazira LNG Terminal?
- Hazira LNG Terminal is owned by Shell Energy India Pvt Ltd. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Hazira LNG Terminal pass?
- Cargoes from Hazira LNG Terminal would normally pass Strait of Hormuz, Bab el-Mandeb and Suez Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Hazira LNG Terminal?
- 6 tracked gas pipelines pass within 25 km of Hazira LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.