Import terminal · Gujarat, India
Dahej LNG Terminal
Dahej LNG Terminal is an operating LNG import terminal in Gujarat, India. The tracker lists 3 tracked units with 17.5 Mtpa operating, 5 Mtpa under construction, the earliest starting in 2004. It is owned by Petronet LNG.
Operating
17.5 Mtpa
23.8 bcm/y · 2 units
Under construction
5 Mtpa
6.8 bcm/y · 1 unit
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Operating | 15 | 20.4 | 2004 | — | Not reported | Petronet LNG [100%] |
| Phase 1 Expansion | Operating | 2.5 | 3.4 | 2019 | 2017 | Not reported | Petronet LNG [100%] |
| Phase 2 Expansion | Under construction | 5 | 6.8 | — | — | Not reported | Petronet LNG [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 2 | 17.5 | 23.8 |
| Under construction | 1 | 5 | 6.8 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- Petronet LNG100%
Parent companies
- Petronet LNG100%
Location
Dahej LNG Terminal at 21.6746° N, 72.5360° E, with 7 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 21.6746° N, 72.5360° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Dahej-Koyali Refinery Gas Pipeline | Operating | 106 km | 1.91 bcm/y | 0 km | route proximity |
| Dahej-OPAL Gas Pipeline | Under construction | 17 km | 1.21 bcm/y | 0 km | route proximity |
| Dahej-Vijaipur Pipeline (DVPL-II) | Operating | 610 km | 39.06 bcm/y | 0 km | route proximity |
| Swan LNG Terminal to Dahej LNG Terminal Gas Pipeline | Under construction | 170 km | 2.56 bcm/y | 0 km | route proximity |
| Dahej-Uran-Panvel-Dhabhol Gas Pipeline | Operating | 815 km | 7.26 bcm/y | 0.6 km | route proximity |
| PLL-DGEN-Sugen Gas Pipeline | Under construction | 90 km | 2.37 bcm/y | 0.6 km | route proximity |
| Dahej-Vijaipur Gas Pipeline (DVPL-I) | Operating | 770 km | 39.06 bcm/y | 6.2 km | route proximity |
Vessels owned by the same companies
Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.
| Vessel | Via | Status | Capacity | Delivered |
|---|---|---|---|---|
| Aseem | Petronet LNG | Operating | 155,000 m³ | 2009 |
| Disha | Petronet LNG | Operating | 138,100 m³ | 2004 |
| Prachi | Petronet LNG | Operating | 173,000 m³ | 2016 |
| Raahi | Petronet LNG | Operating | 138,100 m³ | 2004 |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Dahej LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Dahej LNG Terminal?
- Dahej LNG Terminal is an LNG import terminal in Gujarat, India. It is made up of 3 tracked trains and phases.
- Is Dahej LNG Terminal operating?
- Dahej LNG Terminal is operating, with its first tracked train starting in 2004.
- How much LNG can Dahej LNG Terminal handle?
- Dahej LNG Terminal has 17.5 Mtpa operating, 5 Mtpa under construction, equivalent to 23.8 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns Dahej LNG Terminal?
- Dahej LNG Terminal is owned by Petronet LNG. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Dahej LNG Terminal pass?
- Cargoes from Dahej LNG Terminal would normally pass Strait of Hormuz, Bab el-Mandeb and Suez Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Dahej LNG Terminal?
- 7 tracked gas pipelines pass within 25 km of Dahej LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
In our rankings
Where this appears in the site's generated top lists. Each ranking page states its own method before its table.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.