Import terminal · Gujarat, India
Dahej LNG Terminal
Dahej LNG Terminal is an operating LNG import terminal in Gujarat, India. The tracker lists 3 tracked units with 22.5 Mtpa operating, the earliest starting in 2004. It is owned by Petronet LNG.
Operating
22.5 Mtpa
30.6 bcm/y · 3 units
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Operating | 15 | 20.4 | 2004 | — | Not reported | Petronet LNG Ltd [100%] |
| Unit Phase 1 Expansion | Operating | 2.5 | 3.4 | 2019 | — | Not reported | Petronet LNG Ltd [100%] |
| Unit Phase 2 Expansion | Operating | 5 | 6.8 | 2026 | — | Not reported | Petronet LNG Ltd [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 3 | 22.5 | 30.6 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- Petronet LNG100%
Location
Dahej LNG Terminal at 21.6746° N, 72.5360° E, with 4 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 21.6746° N, 72.5360° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Swan LNG Terminal to Dahej LNG Terminal Gas Pipeline | Under construction | 170 km | 2.56 bcm/y | 0 km | route proximity |
| Dahej-Koyali Refinery Gas Pipeline | Operating | 106 km | 1.91 bcm/y | 21.4 km | route proximity |
| Dahej-OPAL Gas Pipeline | Under construction | 17 km | 1.21 bcm/y | 21.4 km | route proximity |
| PLL-DGEN-Sugen Gas Pipeline | Under construction | 90 km | 2.37 bcm/y | 21.4 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Hormuz
- Bab el-Mandeb
- Suez Canal
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Dahej LNG Terminal?
- Dahej LNG Terminal is an LNG import terminal in Gujarat, India. It is made up of 3 tracked trains and phases.
- Is Dahej LNG Terminal operating?
- Dahej LNG Terminal is operating, with its first tracked train starting in 2004.
- How much LNG can Dahej LNG Terminal handle?
- Dahej LNG Terminal has 22.5 Mtpa operating, equivalent to 30.6 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns Dahej LNG Terminal?
- Dahej LNG Terminal is owned by Petronet LNG. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Dahej LNG Terminal pass?
- Cargoes from Dahej LNG Terminal would normally pass Strait of Hormuz, Bab el-Mandeb and Suez Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Dahej LNG Terminal?
- 4 tracked gas pipelines pass within 25 km of Dahej LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.